出版社:Consejo Superior de Investigaciones Científicas
摘要:This paper presents the results of tests carried out during the construction of a building of flats with cast-in-place girderless hollow floor slab in Sabadell, Spain, using the shoring, clearing and striking (SCS) process.Loads on shores were recorded during the different construction stages of floor slabs 1 to 6.The two first floor slabs had geometry different than the rest.The experimental results were used to analyse load transmission between slabs and shores during the construction of the building with a SCS process.The experimental results were compared with those obtained applying simplified methods that consider the real stiffness of the shoring, obtaining that the method with a better fit was the New Simplified Procedure.
关键词:Transmisión de cargas; clareado; estudio experimental; proceso constructivo; puntales; nuevo procedimiento simplificado
其他关键词:Load transmission; clearing; experimental study; construction process; shores; new simplified procedure