首页    期刊浏览 2024年07月03日 星期三
登录注册

文章基本信息

  • 标题:Datum maintenance of the main Egyptian geodetic control networks by utilizing Precise Point Positioning “PPP” technique
  • 本地全文:下载
  • 作者:Mostafa Rabah ; Mostafa Rabah ; Mahmoud Elmewafey
  • 期刊名称:NRIAG Journal of Astronomy and Geophysics
  • 印刷版ISSN:2090-9977
  • 电子版ISSN:2090-9985
  • 出版年度:2016
  • 卷号:5
  • 期号:1
  • 页码:96-105
  • DOI:10.1016/j.nrjag.2016.02.003
  • 语种:English
  • 出版社:Elsevier
  • 摘要:Abstract A geodetic control network is the wire-frame or the skeleton on which continuous and consistent mapping, Geographic Information Systems (GIS), and surveys are based. Traditionally, geodetic control points are established as permanent physical monuments placed in the ground and precisely marked, located, and documented. With the development of satellite surveying methods and their availability and high degree of accuracy, a geodetic control network could be established by using GNSS and referred to an international terrestrial reference frame used as a three-dimensional geocentric reference system for a country. Based on this concept, in 1992, the Egypt Survey Authority (ESA) established two networks, namely High Accuracy Reference Network (HARN) and the National Agricultural Cadastral Network (NACN). To transfer the International Terrestrial Reference Frame to the HARN, the HARN was connected with four IGS stations. The processing results were 1:10,000,000 (Order A) for HARN and 1:1,000,000 (Order B) for NACN relative network accuracy standard between stations defined in ITRF1994 Epoch1996. Since 1996, ESA did not perform any updating or maintaining works for these networks. To see how non-performing maintenance degrading the values of the HARN and NACN, the available HARN and NACN stations in the Nile Delta were observed. The Processing of the tested part was done by CSRS-PPP Service based on utilizing Precise Point Positioning “PPP” and Trimble Business Center “TBC”. The study shows the feasibility of Precise Point Positioning in updating the absolute positioning of the HARN network and its role in updating the reference frame (ITRF). The study also confirmed the necessity of the absent role of datum maintenance of Egypt networks.
  • 关键词:KeywordsGeodetic control networkDatum maintenanceITRFPPPIGSGeodetic datum
国家哲学社会科学文献中心版权所有