首页    期刊浏览 2024年11月07日 星期四
登录注册

文章基本信息

  • 标题:Industrialised Building System Modular System (IBSMS) Organisational Readiness Framework
  • 本地全文:下载
  • 作者:Muhamad Faiz Musa ; Muhamad Faiz Musa ; Mohammad Fadhil Mohammad
  • 期刊名称:Procedia - Social and Behavioral Sciences
  • 印刷版ISSN:1877-0428
  • 出版年度:2016
  • 卷号:222
  • 页码:83-92
  • DOI:10.1016/j.sbspro.2016.05.191
  • 语种:English
  • 出版社:Elsevier
  • 摘要:AbstractOff-site prefabrication and modern method of construction (MMC) has proven to promote sustainability in the construction industry that improve human sociology, foster economic development and environment stability. Modular construction is an innovation in the Malaysian construction industry. This paper discusses the study on IBSMS Organisational Readiness Framework for modular construction implementation through IBS approach in Malaysia. The study explored and identified the readiness elements and criteria as the main components of the framework. Through the framework, organisations that execute modular construction or IBSMS will be well prepared and ready to execute modular construction efficiently, thus improving Malaysian construction industry.
  • 关键词:Industrialised Building System (IBS);Industrialised Building System Modular System (IBSMS);modular construction
国家哲学社会科学文献中心版权所有