期刊名称:International Journal of Industrial Engineering Computations
印刷版ISSN:1923-2926
电子版ISSN:1923-2934
出版年度:2012
卷号:3
期号:4
页码:617-626
DOI:10.5267/j.ijiec.2012.03.005
语种:English
出版社:Growing Science Publishing Company
摘要:In this paper, we study no-wait flow shop problem where setup times depend on sequence of operations. The proposed problem considers sequence-independent removal times, release date with an additional assumption that there are some preliminary setup times. There are two objectives of weighted mean tardiness and makespan associated with the proposed model of this paper. We formulate the resulted problem as a mixed integer programming, where a two-phase fuzzy programming is implemented to solve the model. To examine the performance of the proposed model, we generate several sample data, randomly and compare the results with other methods. The preliminary results indicate that the proposed two-phase model of this paper performed relatively better than Zimmerman & apos; s single-phase fuzzy method.