期刊名称:International Journal of Industrial Engineering Computations
印刷版ISSN:1923-2926
电子版ISSN:1923-2934
出版年度:2013
卷号:4
期号:4
页码:479-490
DOI:10.5267/j.ijiec.2013.06.007
语种:English
出版社:Growing Science Publishing Company
摘要:In this paper, we develop a two-warehouse imperfect production model under two cases: (i) model starts with shortages (ii) model ends with shortages. Most of the researchers proposed the models for perfect items but we develop for imperfect quality items, which is very realistic. Demand is taken as time dependent and dependent on the production. Holding cost in rented warehouse (RW) is greater than own warehouse (OW). Deterioration is taken as Weibull distribution in both OW and RW. Shortages are allowed and partially backlogged. The effect of learning on production cost is also considered. Learning from one cycle to other cycle, improve the efficiency of the organization. A numerical example including the sensitivity analysis is given to validate the results of the production-inventory model.