  • 标题:Ampliación de las luces de 14 pasos superiores continuos postesados para conseguir el ensanchamiento a seis carriles de la autopista A-7 Barcelona-La Junquera. Tramo: Hostalric-Maçanet
  • 本地全文:下载
  • 作者:Julio Martínez Calzón
  • 期刊名称:Informes de la Construcción
  • 印刷版ISSN:0020-0883
  • 电子版ISSN:1988-3234
  • 出版年度:1994
  • 卷号:46
  • 期号:431
  • 页码:5-25
  • DOI:10.3989/ic.1994.v46.i431.1129
  • 出版社:Consejo Superior de Investigaciones Científicas
  • 摘要:The article describes a simple construction process which provides the possibility of displacement of bridge piers when enlarging of spans is required to meet the demands of traffic under the bridge. The method is based on setting up a stretcher-like system consisting of two steel girders parallel to the structure. The girders gather the permanent forces of the old piers and transfer them to the new ones. In order to achieve the load transference from the old bridge to the new girders, a transverse prestressed web is used in both systems. In the new pier structure, the old deck and the two incorporated girders jointly resist the actions of the service overloads. Beside the pattern solution, the article describes some interesting variations for special cases such as curved, biaxially bent, double bridges, etc.
国家哲学社会科学文献中心版权所有