摘要:In order to reduce the number and time of layups and to increase the period of effective operation of a mechatronic system it is reasonable to carry out predictive recovery works during one stoppage (repair) for a group of component parts with equal, close or multiple operation hours to the prior-to-failure (limiting) state. Such approach gives also the possibility to carry out recovery works with separate elements in parallel, which allows to reduce the system layup time and to increase the production output.