摘要:Abstract
One of the major causes of delays in construction sites belongs to the delays in delivering materials. This paper introduces the integrated Building Information Modelling (BIM) model combined with a supply chain and a controlling system, along with its efficiency for alleviating the negative effects of delays caused by a lack of materials on construction sites. So, firstly the concept of feed-forward control is discussed as a prevention feature in a monitoring system. Then the integrating BIM model with a supply chain is introduced. Finally this case study has shown how the enhanced BIM model can incorporate the feed-forward control in order to decrease the risks of delays caused by a lack of materials in construction. Moreover, this case study might be used as a decision support system for managers to prevent a construction site from future delays by providing valuable information about the required materials in advanced