首页    期刊浏览 2024年11月10日 星期日
登录注册

文章基本信息

  • 标题:Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
  • 本地全文:下载
  • 作者:Hasanpour, Javad ; Ghodoosi, Mohammad ; Hosseini, Zahra Sadat
  • 期刊名称:JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)
  • 印刷版ISSN:2251-9904
  • 出版年度:2016
  • 卷号:10
  • 期号:21
  • 页码:79-92
  • DOI:10.22094/joie.2016.263
  • 语种:English
  • 出版社:ISLAMIC AZAD UNIVERSITY, QAZVIN BRANCH
  • 摘要:The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategies. We also introduce the preemptive extension of the problem which allows activity splitting. In this paper the preemption multi-mode resource-constrained project scheduling problem (P-MMRCPSP) with Minimum makespan and the maximization of net present value (NPV) has been considered. Since the considered model is NP-Hard, The performance of our proposed model is evaluated by comparison with two well-known algorithms; non-dominated sorting genetic algorithm (NSGA II), multi-objective imperialist competitive algorithm (MOICA). These metaheuristics have been compared on the basis of a computational experiment performed on a set of instances obtained from standard test problems constructed by the ProGen project generator, where, additionally, cash flows were generated randomly with the uniform distribution. Since the effectiveness of most meta-heuristic algorithms significantly depends on choosing the proper parameters. A Taguchi experimental design method (DOE) was applied to set and estimate the proper values of GAs parameters for improving their performances. The computational results show that the proposed MOICA outperforms the NSGA-II.
  • 关键词:Multi-objective Project Scheduling; Resource Constraint; Preemptive; Net Present Value; Meta-heuristic Algorithm
国家哲学社会科学文献中心版权所有