摘要:Pillar jib cranes are often mounted to existing floors with the use of an intermediate anchorage steel plate instead of using independent foundations. The process of designing such an intermediate plate for a pillar jib crane and a destruction pattern for plates of insufficient thickness are presented in this article. The required steps of the designing process are introduced and also the required level of detail for the numerical analysis. The aim of this paper is to provide a secure and safe approach to the design of such intermediate anchorage plates.