首页    期刊浏览 2025年02月22日 星期六
登录注册

文章基本信息

  • 标题:Planning Production Capacity Using Time Series Forecasting Method and Linier Programming
  • 本地全文:下载
  • 作者:M. Siregar ; S. Pandiangan ; Dian Anwar
  • 期刊名称:Engineering Management Research
  • 电子版ISSN:1927-7326
  • 出版年度:2018
  • 卷号:7
  • 期号:2
  • 页码:p20
  • DOI:10.5539/emr.v7n2p20
  • 语种:English
  • 出版社:Canadian Center of Science and Education
  • 摘要:The objectives of this research is to determine the amount of production planning capacity sow talc products in the future utilizing previous data from january to december in year 2017. This researched considered three forecasting method, there are Weight Moving Average (WMA), Moving Average (MA), and Exponential Smoothing (ES). After calculating the methods, then measuring the error value using a control chart of 3 (three) of these methods. After find the best forecasting method, then do linear programming method to obtain the exact amount of production in further. Based on the data calculated, the method of Average Moving has a size of error value of Mean Absolute Percentage Error of 0.09 or 9%, Weight Moving Average has a size error of Mean Absolute Percentage Error of 0.09 or 9% and with Exponential Method Smoothing has an error value of Mean Absolute Percentage Error of 0.12 or 12%. Moving Average and Weight Moving Average have the same MAPE amount but Weight Moving Average has the smallest amount Mean Absolute Deviation compared to other method which is 262.497 kg. Based on the result, The Weight Moving Average method is the best method as reference for utilizing in demand forecasting next year, because it has the smallest error size and has a Tracking Signal not exceed the maximum or minimum control limit is = 4. Moreover, after obtained Weight Moving Average method is the best method, then is determine value of planning production capacity in next year using linier programming method. Based on the linier programming calculation, the maximum amount of production in next year by considering the forecasting of raw materials, production volume, material composition, and production time obtained in one (1) working day is 11,217,379 pcs / year, or 934,781 pcs / month of finished product. This paper recommends the company to evaluate the demand forecasting in order to achieve higher business growth.
国家哲学社会科学文献中心版权所有