期刊名称:International Journal of Marine Engineering Innovation and Research
印刷版ISSN:2541-5972
电子版ISSN:2548-1479
出版年度:2017
卷号:1
期号:3
DOI:10.12962/j25481479.v1i3.1997
语种:English
出版社:Institut Teknologi Sepuluh Nopember
摘要:Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulationfloating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation.
关键词:LNG;Mobile Power Plant;Fuel Gas;Fuel Oil;Diesel Engine;Gas Turbine