摘要:The article presented the scientific research of buildings construction optimization problems on the basis of interdisciplinary approach that provides synergy of modern approaches of construction organization and technology, economic theory and political economy, as well as applied mathematics. The formation and realization of the economic-mathematical model of optimal sequence groups of construction objects are considered on the basis of a method of sequential analysis of variants, based on dynamic programming. According to the provided research results the proposals were made for acceleration of these processes in construction through the development of program complex “Optimization of object construction process by the criterion of time” on the basis of mathematical modeling methods, which provided the opportunity to further optimize and obtain consistency and reduce the construction terms of this buildings groups for almost a year (360 days or 61%).