摘要:Side-crossing residential buildings in tunnel construction may lead to building subsidence, structural damage by tension and affect the use of buildings. Aiming at the structural damage caused by the side-crossing structure of Re Shuitang Tunnel NO.1, by simulating the influence of tunnel construction on the building, it is concluded that the surrounding rock above the tunnel will be deformed when the tunnel crosses the building. The maximum horizontal displacement is 0.64 mm and the maximum vertical displacement is 4.43 mm. According to the analysis results, the surrounding rock above the tunnel should be strengthened in time, and attention should be paid to the impact of blasting on residential buildings, so as to ensure the safety of buildings and provide reference for future construction.