摘要:In order to treat oil and other pollutants in downstream surface water causing by the construction process of a hydropower project, many methods were used. Besides that, a set of flocculation and precipitation facilities was designed as an emergency device for entire construction site. Good results were achieved in the treatment of construction wastewater, which has obvious economic and environmental benefits and has reference value for similar projects.