期刊名称:IOP Conference Series: Earth and Environmental Science
印刷版ISSN:1755-1307
电子版ISSN:1755-1315
出版年度:2020
卷号:571
期号:1
DOI:10.1088/1755-1315/571/1/012115
语种:English
出版社:IOP Publishing
摘要:Aiming at the problems of high mining intensity and difficult roof management in a fully mechanized mining face with an ultra-high mining height of 8.8m, this article predicts the pressure parameters and rules of the working face based on the roof management technology of the 12402 fully mechanized mining face in Shangwan Coal Mine. The selection of the working surface bracket and the on-site roof safety management system are explained and analyzed. The results show that the analogy method can be used to predict the mining pressure parameters and rules of the working face to meet the needs of the application of large mining heights; the conventional techniques such as forced caving, "Scraped roof support moving method" and "Advanced drawing support method" are still effective under the condition of 8.8m mining height. The roof safety management system formed during construction guarantees the safe and efficient production of the ultra-high mining height working face, and provides a reference for the popularization of the mining technology of ultra-high mining height.