摘要:Based on the interpretation of GB 18352.6-2016 and combined with the author's actual development experience, the key design points and solutions of the three key problems of fuel system that meet China 6 emission regulations are described, Technical route selection of evaporative emission, definition of technical route of fuel tank and control strategy of tank pressure, evaporative emission control, etc..