摘要:High-saturated reservoir is characterized by high saturation pressure and high gas-oil ratio. The effects of water flooding are easily influenced by the formation pressure and GOR, especially at the late stage. This article presents the relationship between the reasonable pressure maintenance level and GOR as well as water cut based on the actual characteristics of high-saturated reservoir. Then, the reservoir numerical simulation method is used to analyse the influence of pressure recovery rate and water cut rise under different injection-production ratios and injection-production methods. Research results show that the pressure maintenance level of high-saturated reservoir is larger than normal reservoirs. Bigger injection-production ratio results in not only faster pressure recovery rate but also higher water cut. Cyclic injection and production method under the maximum injection rate and liquid extraction amount can enhance oil recovery rate and control water cut rise at the same time, which plays a significant role in improving the development effect of water-flooding in high-saturated reservoirs at the late stage.