  • 标题:Risk analysis and strategic planning on bridge construction works at the toll road procurement projects in Central Java Province
  • 本地全文:下载
  • 作者:Hery Suliantoro ; Nurul Fitriani ; Bagus Hario Setiadji
  • 期刊名称:SHS Web of Conferences
  • 印刷版ISSN:2416-5182
  • 电子版ISSN:2261-2424
  • 出版年度:2018
  • 卷号:49
  • 页码:1-10
  • DOI:10.1051/shsconf/20184902020
  • 语种:English
  • 出版社:EDP Sciences
  • 摘要:Risk is a condition caused by uncertainty. Risks will occur on any construction project, including bridge construction projects. Efforts that can be taken to minimize the impact of these risks are to engage in risk management activities. This research was conducted on bridge construction work on toll road procurement project in Pejagan-Pemalang, Pemalang-Batang and Salatiga-Kertasura. The purpose of this research is to analyze the risk of bridge development project in toll road project using Risk Breakdown Structure (RBS) method and then the result as database in discussing risk response strategy. The bridge construction project has 36 risks that are divided into six groups: materials and equipment, design, human resources, finance, management, nature and environmental conditions. Bad weather risks are the higest risk and seasonal risk causing temporary work stoppages. This risk-response strategy is avoidance. Shortterm avoidance response strategy is to add shift workers, install tents and add additives in the acceleration of the process of maturation of concrete. The long-term avoidance response strategy is to evaluate and rearrange the work schedule by considering the weather forecast report.
国家哲学社会科学文献中心版权所有