  • 标题:IMPLEMENTATION OF VALUE ENGINEERING IN MARKET DEVELOPMENT ON YOS SUDARSO STREET IN ANGGANA DISTRICT, KUTAI KARTANEGARA REGENCY OF EAST KALIMANTAN, INDONESIA
  • 本地全文:下载
  • 作者:Purwanto A. ; Kustamar ; Wedyantadji B.
  • 期刊名称:Russian Journal of Agricultural and Socio-Economic Sciences
  • 印刷版ISSN:2226-1184
  • 电子版ISSN:2226-1184
  • 出版年度:2019
  • 卷号:85
  • 期号:1
  • 页码:426-435
  • DOI:10.18551/rjoas.2019-01.52
  • 语种:English
  • 出版社:Russian Journal of Agricultural and Socio-Economic Sciences
  • 摘要:The objectives of this present research are to: 1) know the elements potentially saved or made it efficient by using value engineering method; 2) know how far this efficiency can be implemented in the market development project. This research uses observation method. Moreover, the secondary data of this present research are in form of supporing data which are made as input and references in doing VE Analysis. The result of this research, after doing calculation of footing structure redesign, shows that the dimension result is greater than the initial planning, but the footing of Pile Cap (P1 & P2) is able to work by itself to have a load on it without combining with pile. Roof structure does not have significant structure redesign; it is only on the working of WF steel column, WF truss leg, and WF Dimension Hemishphere can be minimized so that the cost or the budget for the project can be saved. The work of footing structure is in line with the initial calculation and after doing value engineering, it obtains the initial design budget is of IDR 1.424.428.066,51 and the cost of value engineering analysis result is of IDR 351.280.587,88. It means that by implementing value engineering, it can save IDR 1.073.147.478,63 with saving percentage is of 75,339%. The work of roof structure is in accordance with the initial calculation result and after doing value engineering, it is obtained that the initia design cost is of IDR 885.493.900,20 and the cost of value engineering analysis result is of IDR 751.756.078,50. It shows that by implementing the value engineering, it can save IDR 133.737.821,70 with saving percentage is of 15,133%.