摘要:The need to modernize residential construction technologies is an imperative for reducing labour, material, technical, fuel and energy resources. The purpose of the study is to optimize the construction time regulations for the large-panel residential buildings by synchronizing construction flows. The methodological basis contains the principles of climatic zoning for building construction and technical regulation, affecting the particular features of architectural design and the construction schedule. A technique for the combination of maximum allowable types of work under continuous construction arrangement has been developed and coefficient of combination of different types of work for construction flows synchronization has been determined. The practical significance of the study is to improve the process of exterior wall panels installation, provided that an integrated regulation model based on the Spider Project software package is used. The social significance of the study is to make the reduction of the construction time and saving resources possible. The originality of the study is that the combining of different work types during the installation of exterior wall panels of a large-panel residential building has been justified. The need for creation of regional regulations for the construction time has been proved.
关键词:construction of residential buildings;construction time;construction and climatic zoning;technical regulation;combination of types of work