摘要:With the development of underground transportation, in order to reduce the impact on the surrounding environment and traffic, Hejiaying subway island station adopts the concealed excavation method. During the construction process, considering the construction method, tunnel layout, ventilation requirements, and the construction working face as a multi-conductor cave, more stringent requirements are put forward for the construction ventilation of the tunnel. Through the combination of theoretical calculation and numerical simulation, a ventilation method suitable for the actual construction conditions at the site was developed. After applying the scheme to practice, the feasibility of the scheme was verified through the determination of field data, and the improvement of the construction environment for tunnel personnel was achieved, which has certain reference value for similar projects.