摘要:In view of the demand of 800 meters Super Long Span CFST arch bridge, the composite bridge of CFST flying swallow arch and self-anchored suspension cable is proposed. The thrust of flying-bird CFST arch bridge and the tension of self-anchored suspension bridge are balanced, forming a self-balanced structure system. The arch rib structure is mainly stressed, supplemented by the self-anchored suspension system, which works together and has complementary advantages. Using the single leaf hyperboloid variable section steel tube four limb space truss arch rib structure, the self-weight of the mid span arch rib section structure is reduced, the risk of construction and hoisting of the mid span section is reduced, the section size at the arch foot is increased, the mass center and stiffness center of the arch bridge structure are effectively reduced, and the stability of the super long span concrete-filled steel tube arch bridge is increased. Combined with the actual project, the parameters are designed, the Midas finite element model is established, the internal force analysis and calculation, modal analysis and buckling analysis are carried out, and the superiority of the structural technical measures is verified.