期刊名称:International Journal of Sustainable Engineering
印刷版ISSN:1939-7038
出版年度:2021
卷号:14
期号:6
页码:1665-1679
DOI:10.1080/19397038.2021.1970853
语种:English
出版社:Taylor & Francis Group
摘要:ABSTRACTThis paper has developed a model to perform more sustainable scheduling in manufacturing operations based on the combination of makespan, profit margin, and environmental impact indicators. A case study was designed to run the developed model in the production of automotive identification labels. The proposed model combined the NEH heuristics for a flow-shop production scheduling problem followed by the cradle-to-gate Life Cycle Assessment of the labels, in order to find scheduling solutions for minimising major environmental impacts and aggregate more value to the production flow. The main results showed that the proposed model was able to increase the company’s schedule performance. For the scenario analysis, two-hybrid heuristics were compared: NEHS-1 and NEHS-2, and both showed better schedule results than the classical NEH. However, the best results were presented by the NEHS-2, and it should be further improved with local search heuristics, in future research.