首页    期刊浏览 2025年02月22日 星期六
登录注册

文章基本信息

  • 标题:Exploring Correlations between Travel Time Based Measures by Year, Day-of-the-week, Time-of-the-day, Week-of-the-Year and the Posted Speed Limit
  • 本地全文:下载
  • 作者:Srinivas Pulugurtha ; Srinivas Pulugurtha ; Krupanidhi Koilada
  • 期刊名称:Urban, Planning and Transport Research: An Open Access Journal
  • 电子版ISSN:2165-0020
  • 出版年度:2021
  • 卷号:9
  • 期号:1
  • 页码:1-17
  • DOI:10.1080/21650020.2020.1845230
  • 语种:English
  • 出版社:Taylor and Francis Ltd
  • 摘要:This research explores correlations between travel time-based measures, comprehensively, by year, day-of-the-week (DoW), time-of-the-day (ToD), week-of-the-year (WoY), and the posted speed limit using raw one-minute interval travel time data for 3,290 road links in Charlotte, North Carolina. The data were processed, normalized, and categorized into 57 datasets accounting for the year, DoW, ToD, WoY, and the posted speed limit. Pearson correlation coefficient matrices were generated to explore the correlations between travel time measures (minimum, maximum, and average; 10th, 15th, 50th, 85th, 90th, and 95th percentile travel times), travel time reliability measures (buffer time – BT, buffer time index – BTI, planning time index – PTI, and travel time index – TTI), and travel time variability measures (based on 90th, 85th, 15th and 10th percentile travel times). The percentages based on scores associated with the correlations were also examined. Travel time measures and travel time variability measures are moderately or highly correlated with each other. BT is moderately or highly correlated with all other measures, while the correlation between BTI, PTI and TTI and travel time measures is relatively low. There is a positive correlation between BTI and PTI and a negative correlation between BTI and TTI in most instances.
国家哲学社会科学文献中心版权所有