期刊名称:International Journal of Advances in Engineering and Management
电子版ISSN:2395-5252
出版年度:2021
卷号:3
期号:5
页码:43-51
DOI:10.35629/5252-0304540555
语种:English
出版社:IJAEM JOURNAL
摘要:J.K FENNER INDIA LTD., is a leading power transmission belt manufacturer in the world. They manufactures V-belts, Timing belts, Poly V-belts and REC (Row Edge Cogged) belts.J.K FENNER engineers design and maintain the tooling utilized in the manufacturing lines. In this organization, raw materials are milled and calendared in the calendaring machine. After that, they are coated over the mould with dipped cord in building section. Then the mould is cured in vulcanizer and cooled in cooling tank. After cooling, the belt sleeves are stripped from the mould by Stripping machine. The stripped sleeves are finished with the required shape and required dimensions. They have some problems in production line with large amount of scrap. The main cause of the scrap is due to sleeve damage in stripping machine. In this machine, 8 gripping hands are used to grip the sleeve. Each hand having a single grip belt. These single belts causes improper gripping. To reduce this sleeve damage, we are suggested a design of double grip belt in each gripping hands. It increases the contact area of gripping to make a proper gripping of sleeve, which in turn increases the productivity and reduces the scrap and mould damage.
关键词:Stripping Machine;Single belt grip;Double belt Grip;Scrap;Sleeve Damage