期刊名称:International Journal of Advances in Engineering and Management
电子版ISSN:2395-5252
出版年度:2021
卷号:3
期号:7
页码:2263-2271
DOI:10.35629/5252-030721062128
语种:English
出版社:IJAEM JOURNAL
摘要:Huangzhushan Tunnel is a key control project on Jiangyu Expressway with a total length of 4165m. Combining with numerical simulation, this paper carries out numerical simulation analysis of the stability of the face of Huangzhushan Tunnel under partial infiltration condition, reveals the variation rules of surface displacement, axial force, pore water pressure and safety factor of the face before and after reinforcement under partial infiltration condition, which can provide technical reference for safe entry into the tunnel.