首页    期刊浏览 2024年07月07日 星期日
登录注册

文章基本信息

  • 标题:Primary frequency regulation capacity enhancement of CHP units: Control strategy combining high pressure valve adjustment and heating extraction steam adjustment
  • 本地全文:下载
  • 作者:Zhaozhao Liu ; Zhaohui Zheng ; Jiwei Song
  • 期刊名称:Case Studies in Thermal Engineering
  • 印刷版ISSN:2214-157X
  • 电子版ISSN:2214-157X
  • 出版年度:2022
  • 卷号:35
  • 页码:102097
  • 语种:English
  • 出版社:Elsevier B.V.
  • 摘要:With the increasing penetration of renewable energy in China, the primary frequency regulation (PFR) performance of coal-fired units plays more critical role in sustaining the security and stability of the electrical power system. A case study regarding the 350 MW combined heat and power (CHP) unit is conducted to analyze the response capacity to large frequency disturbances of the grid. Simulation models of PFR are developed to reflect the unit characteristics. The PFR capacity is evaluated for six common operating load points in the heating season, and only some load points could satisfy the power demand when grid frequency deviations are −0.122 Hz to −0.165 Hz. Further, the feasibility of the PFR control strategy combining high pressure valve adjustment and heating extraction steam adjustment is explored, resulting in enhanced response capacity of the unit. The maximum increment of PFR capacity under above large disturbances is 6.03 MW, an improvement of 48.72%. Moreover, large grid frequency deviation disturbances are simulated, results show that the power contribution index increases from 56.2% to 88.9% with the novel PFR control strategy. Above-mentioned results mean that the PFR capacity of CHP units is enhanced in response to large grid frequency disturbances in the heating season.
  • 关键词:CHP Heating extraction steam Primary frequency regulation Valve opening Heat network
国家哲学社会科学文献中心版权所有