摘要:With the large-scale renewable energy grid integration, the problems of traditional transmission network planning methods, such as high investment, low utilization rate and difficulty in implementation, have gradually emerged. Therefore, in order to improve the level of new energy consumption, effectively improve the operation efficiency of power grid and optimize the investment benefit, this paper proposes a new mode of power grid planning based on adjustable integrated resources. This paper focuses on two key planning methods: new energy confidence capacity assessment methods and load forecasting methods considering demand side resources.Then the paper takes a city-level 220 KV power grid as an example, applies a new power grid planning method to carry out planning, and verifies the effectiveness of the proposed planning model and method.