首页    期刊浏览 2024年12月03日 星期二
登录注册

文章基本信息

  • 标题:Improved Ribbon Bridge Emplacement in Cold-Weather Operations
  • 本地全文:下载
  • 作者:Thomas Hazen ; Michael Pope ; Mary Oliver
  • 期刊名称:Engineer
  • 印刷版ISSN:0046-1989
  • 电子版ISSN:1554-9496
  • 出版年度:2018
  • 卷号:48
  • 页码:42-47
  • 语种:English
  • 出版社:U.S. Army Maneuver Support Center * Development Support Department
  • 摘要:Seventeen years had passed since the 1438th Multirole Bridge Company (MRBC) had conducted cold-weather bridging operations. As the unit prepared to conduct a 21-day annual training (AT) exercise, the frigid North Missouri winter crept in. Temperatures fell below freezing and remained there throughout the weeks preceding AT. These conditions led to significant ice accumulation on all bodies of water in the area of operations, creating an ice obstacle the likes of which the 1438th MRBC had never previously negotiated. Further complicating the situation was the external evaluation by First Army, which the 1438th needed to pass on the fourth day of AT.
国家哲学社会科学文献中心版权所有