期刊名称:International Journal of Hybrid Information Technology
印刷版ISSN:1738-9968
出版年度:2015
卷号:8
期号:7
页码:305-318
DOI:10.14257/ijhit.2015.8.7.28
出版社:SERSC
摘要:Since that a job usually contains several working procedures in actual production, and it’s hard to optimize the flexible collaborative planning, the flexible lot splitting and scheduling of the job simultaneously in batch production mode, a model for multi-objective integration of flexible collaborative planning and fuzzy lot-splitting scheduling is established. We take four performance indicators below which are the most common as standards to optimize the model: average delivery satisfaction, fuzzy total cost, fuzzy completion time and average credibility of job tardiness, and then a multi-objective algorithm based on the Pareto optimal is established. In this algorithm, we design the integrated coding scheme, which include collaboration chromosome, lot-splitting chromosome and scheduling chromosome, meanwhile the Pareto optimal scheme is designed. Finally, the efficiency of the model and algorithm is proved by the simulation.
关键词:Multi-objective optimization; Flexible collaborative planning; Fuzzy flexible lot splitting; integrated model