标题:Application of Technical Advancement in the Supply of Structural Design and Drawings to Improve the Efficiency and Adopting a Best Practice Model to Minimize Delays in Construction Projects
期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2016
卷号:5
期号:2
页码:2452
DOI:10.15680/IJIRSET.2015.0502168
出版社:S&S Publications
摘要:Necessity of changes in structural specifications during construction is a common occurrence. The studyfocuses on the causes of discrepancies at the design and construction interface to avoid delays and speed up theconstruction by the application of technological advancement. The subject is divided into two parts. The first partcovers a review of literature discussing the subject of design construction help of the interface issues. The review whichincludes major research papers, and some text books, is summarized into various parts; interface between employees,construction details, the cost and pricing aspects, and the management and administration of change orders. Theinformation and recommendations made in this part were used to develop and establish direction for the second part ofthe study. Initially pilot study was carried out based on survey questionnaire developed through literature review andwith the questionnaire the problems are ranked and then the Expert System is to be formed as the rectification methodfor the defects.
关键词:Design-construction interface; BIM mode; Design-built model; time delay