首页    期刊浏览 2024年11月29日 星期五
登录注册

文章基本信息

  • 标题:Off-Line and Dynamic Production Scheduling – A Comparative Case Study
  • 作者:Andrzej Bożek ; Marian Wysocki
  • 期刊名称:Management and Production Engineering Review
  • 印刷版ISSN:2080-8208
  • 电子版ISSN:2082-1344
  • 出版年度:2016
  • 卷号:7
  • 期号:1
  • 页码:21-32
  • DOI:10.1515/mper-2016-0003
  • 语种:English
  • 出版社:Walter de Gruyter GmbH
  • 摘要:A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also been implemented, i.e., dispatching rules for the completely reactive scheduling and a multi-agent system for the predictivereactive scheduling. In these implementations three distinct models of the problem have been used, based on: graph representation, optimal constraint satisfaction, and Petri net formalism. Each of these solutions has been verified in computational experiments. The results are compared and some findings about advantages, disadvantages, and suggestions on using the solutions are formulated.
  • 关键词:flexible job shop ; lot streaming ; off-line scheduling ; dynamic scheduling ; tabu search ; constraint programming ; dispatching rules ; Petri nets ; multi-agent systems
Loading...
联系我们|关于我们|网站声明
国家哲学社会科学文献中心版权所有