摘要:The paper deals with the partial results of diagnostics of experimental sections of ballastless track Rheda 2000® and transition areas between ballastless and ballasted track structure around portals of tunnel Turecky vrch after six measurement cycles. The paper presents differences between each operational measurement and the measurement before putting sections into operation, which indicates a development of track geometry quality.