  • 标题:Production Rate Determination for Linear Construction Projects Based on Linear Scheduling Method
  • 本地全文:下载
  • 作者:Liqiang Liu ; Yisheng Liu ; Yuanjie Tang
  • 期刊名称:International Journal of Smart Home
  • 印刷版ISSN:1975-4094
  • 出版年度:2016
  • 卷号:10
  • 期号:4
  • 页码:143-152
  • DOI:10.14257/ijsh.2016.10.4.14
  • 出版社:SERSC
  • 摘要:Traditional scheduling methods such as CPM or PERT have been found to be inappropriate for scheduling the linear construction projects. According to the limitations of Traditional scheduling methods, Linear Scheduling Method (LSM) is proposed specifically for linear construction projects. Aiming at overcoming the limitations of network technology in deciding the production rate of linear construction projects, basing on LSM with its mathematical principle, this paper proposes a new method to decide the production rate of linear construction projects. This paper first analyses the parameters of linear scheduling method and their interrelationships, such as distance interval, time interval, activity, CAP determination of LSM. Then it gives determination method of production rate and the rate float. The determination method can increase the effectiveness of production rate input and output data for the linear projects, which will significantly improve the resource allocation. It also draws the effect of production rate float in the construction schedule control.
  • 关键词:linear project; production Rate; production Rate float; linear scheduling ; method
国家哲学社会科学文献中心版权所有