  • 标题:A Model for Evaluation of Delays in Construction Projects
  • 本地全文:下载
  • 作者:Ghada Taha ; Mohamed Badawy ; Omar El-Nawawy
  • 期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
  • 印刷版ISSN:2347-6710
  • 电子版ISSN:2319-8753
  • 出版年度:2016
  • 卷号:5
  • 期号:3
  • 页码:3021
  • DOI:10.15680/IJIRSET.2016.0503048
  • 出版社:S&S Publications
  • 摘要:This study aims to identify the main causes of delay in construction projects. The study depends on aquestionnaire survey list for determining the probability and the severity for the main causes of delay in constructionprojects. The questionnaire consists of total factors of ten groups. These ten groups have been consisted of total 63delay factor.In this study, the authors found that most five important factor which effect on delay of the construction project are"Delay in progress payments by owner", "Poor site management and supervision by contractor", "Lack in qualifiedlabours", "Difficulties in financing project by contractor", and "Ineffective planning and scheduling of project bycontractor".A CPD Evaluation Model to evaluate the importance of each cause according to its importance index (IMP.I) and thenranking all causes was designed. The model was designed by using Virtual Basic.net.
  • 关键词:Construction industry; causes of delay; Probability Index; Severity Index; CPD Evaluation Model .