期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2013
卷号:2
期号:8
页码:4043
出版社:S&S Publications
摘要:Flo w shop scheduling problems as a typical manufacturing challenge have gained wide attention in academic fields. In this paper, we consider two stage flow shop scheduling problem in which a job block for a group job and the interval of non-availability of machine has been taken with an objective to minimize the make span. This paper provides a branch and bound technique to find optimal or near optimal sequence. This approach is very simple and easy to understand and, also provide an important tool for decision makers to design a schedu le for two stage flow- shop scheduling problems. The method is clarified with the help of numerical illustration .
关键词:Flow shop scheduling; Flow Time; Make span; Branch and Bound Technique.