期刊名称:Australasian Journal of Construction Economics and Building
印刷版ISSN:1835-6354
电子版ISSN:1837-9133
出版年度:2003
卷号:3
期号:2
页码:33-42
语种:English
出版社:University of Technology, Sydney
摘要:With the increasing stock of aging structures, buildingdemolition is becoming a challenging research field fromthe perspective of management. As the converse ofconstruction, management of demolition puts forward somenew management themes or adds some new contentseven though the same issues are faced in constructionmanagement. This research aims to develop a quantitativeapproach to estimate the costs of a demolition project. Acost analysis method is presented to systematically breakdown the cost components involved in the demolition ofa structure. Due to the lack of robust research in theoryand systematic summary in practice to date, the economicperformances of demolition will be studied through a casestudy, and the majority of parameters are derived fromactual experiences in practice. The proposed demolition costestimation method is applied to the actual form of buildingelimination (ScenariO 1), and further comparison is carriedout with two other elimination methods, which are the newlydeveloped deconstruction (Scenario 2) and mechanicaldemolition (Scenario 3). Deconstruction is found to be themost profitable in this particular instance, and is closelyfollowed by the actual form.