Real options with information costs: a synthesis.
Bellalah, Mondher ; Pariente, Georges
ABSTRACT
This paper presents some new results regarding the pricing of real
options in the presence of market frictions. Since the standard
literature ignores the role of market frictions and the effect of
incomplete information, we rely on Merton's (1987) model of capital
market equilibrium with incomplete information (CAPMI) to introduce
information costs in the pricing of real assets. Using this model
instead of the standard CAPM of Sharpe (1964) allows computing the value
of the firm and its assets in the presence of information uncertainty.
In the original derivation of the Black-Scholes (1973) model, the CAPM
was used. In the same context, the CAPMI model can be used. Using the
methodology in Bellalah (1999, 2001, 2002) and in Paxson (2003) for the
pricing of real options, we extend the standard models to account for
the effects of shadow costs of incomplete information. The models can be
used for the valuation of several real options, R&D projects as well
as projects with several stages like joint ventures.
JEL Classification: G12, G20, G31
Keywords: Firm value; Real options; Information costs; Joint
venture
I. INTRODUCTION
The standard literature on capital budgeting techniques uses the
net present value as a reference criterion in investment decisions. The
analysis is mainly based on the use of the cost of capital in the
discounting of future cash flows. A project is accepted if its extended
Net Present Value, NPV, is positive, otherwise it is rejected. The
extended NPV corresponds to the standard NPV plus the flexibility in
investment decisions. The standard technique for calculating the NPV has
not changed much since Fisher (1907) by discounting the expected cash
flow at an appropriate discount rate. The research in this area is based
on the specification and estimation of the discount rate.
Over the last two decades, a body of academic research takes the
methodology used in financial option pricing and applies it to real
options in what is well known as real options theory. This approach
recognizes the importance of flexibility in business activities. Today,
options are worth more than ever because of the new realities of the
actual economy: information intensity, instantaneous communications,
high volatility, etc (2). The literature on real options and discounted
cash flow techniques ignores the role of information uncertainty.
However, these costs play a central role in financial markets and
capital budgeting decisions. Financial models based on complete
information might be inadequate to capture the complexity of rationality
in action.
Some factors and constraints, like entry into a business are not
costless and may influence the short run behaviour of asset prices. The
treatment of information and its associated costs play a central role in
capital markets. If an investor does not know about a trading
opportunity, he will not act to implement an appropriate strategy to
benefit from it. However, the investor must determine if potential gains
are sufficient to warrant the costs of implementing the strategy. These
costs include time and expenses required to create data base to support
the strategy, to build models and to get informed about the technology.
This argument applies in varying degrees to the adoption in practice of
new structural models of evaluation.
This reasoning holds not only for individual investors but also for
professional managers who spend resources and time in the same spirit.
It is also valid for the elaboration and implementation of option
pricing models.
Hence, recognition of information costs might be important in asset
valuation and has the potential to explain empirical biases exhibited by
prices computed from complete information models. As shown in Merton (1987), the "true" discounting rate for future risky cash
flows must be coherent with his simple model of capital market
equilibrium with incomplete information. This model can be used in the
valuation of real assets. Nowadays, a rich set of criteria is used to
recognize the company's real options. Consultants look beyond
traditional financial analysis techniques to get reasonable guidelines in investment practices. Actual decision making in firms resorts to real
options. The value of the firm can have two components: the value of the
existing projects and the value of the options hold by the firm to do
other things. The use of standard option valuation techniques in the
valuation of real assets is based on some important assumptions (3.)
Managers are interested not only in real options, but also in the latest
outgrowth in DCF analysis.
The structure of the paper is as follows:
Section II presents a simple framework for the valuation of the
firm and its assets in the presence of information costs. Using
Merton's (1987) model of capital market equilibrium with incomplete
information, we show how to extend the standard valuation context to
account for the effects of incomplete information in the computation of
the firm value. We use the main results in the real option literature to
make the standard analogy between financial and real options. This
allows the presentation of the main applications of the real option
pricing theory. Section III develops a simple context for the pricing of
real options with information costs. We develop simple analytic formulas
for the pricing of commodity options in the presence of information
costs. The models are simulated and compared to the models in Black and
Sholes (1973) and Black (1976). Section IV extends the results in some
real option pricing models to account for information costs. This allows
us to study the investment timing and the pricing of real assets using
standard options.
Section V extends the formulas in Geske (1979) for the valuation of
the firm and its assets in the presence of information costs. Section VI
extends the results in Lint and Pennings (1998) for the pricing of the
option on market introduction with information costs. Section VII
develops some simple models for the pricing of real options in a
discrete time setting by accounting for the role of shadow costs of
incomplete information. We first extend the Cox, Ross and Rubinstein
(1979) model to account for information costs in the valuation of
managerial flexibility and the option to abandon. Then, we use the
generalization in Trigeorgis (1990) for the pricing of several complex
investment opportunities with embedded real options to account for the
effects of information costs. Most of the models presented in this paper
can be applied to the valuation of biotechnology projects and
investments with several stages.
II. FROM FINANCIAL OPTIONS TO REAL OPTIONS AND THE EFFECTS OF
INFORMATION COSTS: SOME STANDARD APPLICATIONS
The standard analysis in corporate investments needs the projection
of the project's cash flows and then to perform an NPV analysis.
The discount rate is set with regard to the risk of the project. The
riskier the project, the higher the manager sets the discount rate.
This standard approach ignores the presence of information costs.
However, information plays a central role in the valuation of financial
assets and must be accounted for in the valuation process.
Managers recognize that the NPV analysis is incomplete and
short-sighted. This analysis ensures in theory perpetual profitability
for a company. The NPV fails because it assumes the decision to invest
in a project is all or nothing. Hence, it ignores the presence of many
incremental points in a project where the option exists to go forward or
abort (4). Realistic view of the capital budgeting process portrays
projects as a sequence of options (5).
Merton (1987) presents a simple context to account for information
costs. Before applying the main implications of Merton's model, we
remind first this model and the definition of the shadow costs of
incomplete information.
A. Merton's model
Merton's model is a two period model of capital market
equilibrium in an economy where each investor has information about only
a subset of the available securities.
The main assumption in the Merton's model is that an investor
includes an asset S in his portfolio only if he has some information
about the first and second moment of the distribution of its returns. In
this model, information costs have two components: the costs of
gathering and processing data for the analysis and the valuation of the
firm and its assets, and the costs of information transmission from an
economic agent to another.
Merton's model may be stated as follows:
[[bar.R].sub.s] - [gamma] = [[beta].sub.s][[[bar.R].sub.m]-[gamma]]
+ [[lambda].sub.s][[lambda].sub.m]
where: [[bar.R].sub.s]: the equilibrium expected return on security
S,
[[bar.R].sub.m]: the equilibrium expected return on the market
portfolio,
R: one plus the riskless rate of interest, r,
[beta] = cov([bar.R]s/[bar.R]m)/Var([bar.R]m): the beta of security
S,
[[lambda].sub.s]: the equilibrium aggregate "shadow cost"
for the security S,
[[lambda].sub.m]: the weighted average shadow cost of incomplete
information
The CAPM of Merton (1987), referred to as the CAPMI is an extension
of the standard CAPM to a context of incomplete information. Note that
when [[lambda].sub.m] = [[lambda].sub.s] = 0, this model reduces to the
standard CAPM of Sharpe (1964).
B. Application to a biotechnology firm
For a biotechnology firm, the development of a drug needs several
stages: discovery, pre-clinical, Phase I clinical trials, Phase II
clinical trials, Phase III clinical trials, submission for review and
post approval. We can apply in this setting Merton's (1987) model
of capital market equilibrium with incomplete information for the
computation of the cost of capital, the expected net present value
(ENPV) in the decision tree method. Following the analysis in Kellogg
and Charnes (1999), we will generalize their decision-tree method and
the application of the binomial model to account for shadow costs of
incomplete information.
A model is constructed to compute the expected net present value
(ENPV) without accounting for growth options. The (ENPV) can be computed
in the presence of information costs. In the decision tree method, the
ENPV is computed as:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII]
where: i = 1, ..., 7: an index of the 7 stages in the project,
[[rho].sub.i]: the probability that stage i is the end stage for
product i,
T: the time at which all future cash flows become zero,
DC[F.sub.it]: the expected development stage cash flow at time t
given that stage i is the end stage,
[r.sub.d]: the discount rate for development cash flows,
j = 1 to 5: an index of quality for the product,
[q.sub.j]: the probability that the product is of quality j,
[r.sub.c]: the discount rate for commercialization cash flows.
The discounting rates rd and [r.sub.c] can be estimated using
Merton's CAPMI as in Bellalah (2000, 2001). This method is easy to
implement and accounts for the effects of information costs in project
valuation.
C. From Financial options to real options: some examples Real
option valuation maps out the possibilities available to a company,
including those not readily apparent in the decision tree. By varying
the discount rate through the tree, it accounts for the relative level
of risk for different cash flows. Real option valuation can also
identify the optimal course of the company at each stage in the process.
a. The standard analogy between financial and real options
There is a well established analogy between financial options and
corporate investments that lead to future opportunities. It is evident
for a manager why investing today in research and development or in a
new marketing program can lead to a possibility of new markets in the
future. Dixit (1992, 1995) and Dixit and Pindyck (1994) suggest that
option theory provides helpful explanations since the goal of the
investments is to reveal information about technological possibilities,
production costs or market potential.
Consider for example a generic investment opportunity or a capital
budgeting project to see the analogy with financial options. The
difficult task lies in mapping a project onto an option. A corporate
investment opportunity looks like a call because the firm has the right
but not the obligation to acquire a given underlying, (the operating
assets of a project or a new business). If the manager finds a call
option in the market similar to the investment opportunity, then the
value of that option can give him information about the value of the
investment opportunity. Using this analogy between financial options and
real options allows to know more about the project. This approach is
more interesting than the standard discounting cash flow techniques DCT.
The option implicit in the project (the real option) and the NPV
without the option are easily compared when the project can no longer be
delayed. The reader can refer to Kogut (1991), and Mac Donald and Siegel
(1984, 1986) among others.
A real option confers flexibilities to its holder and can be
economically important. Paddock, Siegel and Smith (1988) and Berger et
al (1996) show that the value of a firm is the combined value of the
assets already in use and the present value of the future investment
opportunities. There are several situations that lead to real options in
different sectors in the economy.
b. Standard and complex real options and their applications: some
examples If you consider the example of high-tech start-up companies,
these firms are valued mainly for their real options rather than their
existing projects. The market recognizes today the value of these
options. While standard options are easily identified, it is more
difficult to identify compound and learning options.
Compound options generate other options among exercise. These
options involve sequenced or staged investments. When a manager makes an
initial investment, he has the right to make a second investment, which
in turn gives the right to make a third investment, and so on.
Learning options allow the manager to pay to learn about an
uncertain technology or system. Staged investments give managers the
right to abandon or scale up projects, to expand into new geographic
areas and investing in research and development (6).
A first example of compound options can be found in a staged
investment, which may be assimilated to a sequence of stages where each
stage is contingent on the completion of its predecessor. This is the
case for a company seeking to expand in foreign markets. The firm might
start in a single territory. It can then learn and modify the specific
features of its product. The first experience enables the firm to expand
into similar overseas markets. However, the manager must weigh the value
of the option to expand cautiously against the potential costs of coming
second in some or all of these markets. This situation corresponds also
to joint ventures and the valuation of joint ventures and biotechnology
products where each stage is contingent on the subsequent stages.
A second example is given in the market for corporate control and
acquisitions. A sequence of acquisitions represents a staged series of
investments and can be assimilated to compound options. Real options can
be used in this context to value all possible contingencies. In this
case, the literature regarding exotic options can be applied to value
the different real options.
A third example corresponds to mining companies. Mining companies
must often give an answer to the following question: when to develop the
properties they own and how much to bid for the right to implement
additional properties. These decisions refer to a combination of
options: the option to learn about the quantity of ore and the option to
defer the development waiting for favourable prices (7).
A fourth example is given for the development of a natural gas
field (compound rainbow options). Combinations of learning options and
rainbow options can arise for some firms (8).
A fifth example is given by R&D in pharmaceuticals (Rainbow
options) Projects in R&D combine learning and compound options.
R&D projects contain both technological and product uncertainties
(9).
III. THE VALUATION OF STANDARD AND REAL OPTIONS WITH INFORMATION
COSTS: THE GENERAL CONTEXT
Several models in financial economics are proposed to deal with the
ability to delay an irreversible investment expenditure (10). Before
presenting some models for the valuation of real options in a continuous
time setting, we present the general context for the valuation of
financial options with information costs. Our definition of information
costs refers to the models in Merton (1987) and Bellalah (1999). Merton
(1987) introduced a modified capital asset pricing model where each
investor can participate only in markets contained in an exogenous,
investor specific subset of all asset markets. He examines how this
modification affects the standard CAPM and shows that limited market
participation can explain empirical anomalies. Since the acquisition of
information and its dissimination are central activities in finance and
in the investment process, Merton's (1987) simple model of capital
market equilibrium with incomplete information might provide some
insights into the behaviour of security prices. The model allows
studying the equilibrium structure of asset prices and its connection
with empirical anomalies in the same context.
The appendix provides the derivation of a Differential equation for
a derivative security on a spot asset in the presence of a continuous
dividend yield and information costs. It provides the general
differential equation for the pricing of derivative assets with
information costs.
It gives also the valuation of simple European and American
Commodity options with information costs.
The following tables provide simulations results regarding our
model with incomplete information and the Black and Scholes model.
Option values are compared for different levels of the underlying asset
(from 70 to 120) and different information costs regarding the option
and its underlying asset.
The following tables provide simulation results for the extended
Black model in the presence of information costs. Simulations are given
for different levels of the underlying futures price and several
information costs.
IV. THE INVESTMENT TIMING AND THE PRICING OF REAL ASSETS WITHIN
INFORMATION UNCERTAINTY
The investment opportunity is analogous to a call option on a
common stock since it gives the right to make investment expenditure at
the strike price and to receive the project. The firm's option to
invest refers to the possibility to pay a sunk cost I and to receive a
project which is worth, V (11). Irreversibility is an important
component of the investment process (12). The dynamics of the
project's value can be described by the following equation:
dV/V= [alpha]dt + [sigma] dz (3)
where a and s refer to the instantaneous rate of return and the
standard deviation of the project, and dz is a geometric Brownian
motion.
This equation shows that the current project value is known,
whereas its future values are log-normally distributed. Following
Bellalah (2001 a), we denote by X the price of an asset perfectly
correlated with V.
The dynamics of X are represented by:
dx/ X= [mu]dt + [sigma] dz (4)
where [mu] stands for the expected return from owning a completed
project.
We denote by [delta] = [mu]-[alpha]. If V were the price of a
share, d would be the dividend rate on the stock. In this context, d
represents an opportunity cost of delaying investment. If [delta] is
zero, then there is no opportunity cost to keeping the option alive.
Let C(V) be the value of the firm's option to invest. Using
Merton's (1987) model, Bellalah (2001 a) obtain option prices in
the context of incomplete information. Consider the return on the
following portfolio P: hold an option which is worth C(V) and go short
C(V) units of the project where the subscript V refers to the partial
derivative with respect to V:
P = C - [C.sub.v]V (5)
The total return for this portfolio over a short interval of time
dt is:
dC - [C.sub.v]dV - [delta]V [C.sub.v] dt (6)
Since there are information costs supported on the option and on
its underlying assets, the return must be equal to (r + [lambda]v) for
the project and (r + [lambda]c) for the option where [lambda]v and
[lambda]c refer respectively to the information costs on the project and
he option. In fact, as it appears in the previous analysis and as it is
suggested by the referee, the information cost relative to the project
[lambda]v ncerns the collection of information, the analysis and the
study of the project. The information cost regarding the option is
[lambda]c explained by the sunk costs spend to analyze, value, collect
information and implement models regarding the option. Our analysis
reveals that the dividend yield d is adjusted to become [delta] +
[lambda]c - [lambda]v. The discounting of the option price is done under
the risk neutral probability with information costsa. This can be
written as r + [lambda]c. The risk neutral drift is changed from r -
[delta] to r - [delta] + [lambda]v.
In this context, we have:
dC - [C.sub.v]dV - [delta]V [C.sub.v] dt = (r + [lambda]c)C dt + (r
+ [[lambda].sub.v]) V [C.sub.v] dt (7)
or:
1/2 [[sigma].sup.2][V.sup.2][C.sub.vv] + (r + [[lambda].sub.v] -
[delta])V[C.sub.v] - (r + [lambda]c) C = 0 (8)
This equation for the value of C(V) must satisfy the following
conditions:
C(0) = 0
C([V.sup.*]) = [V.sup.*] - I
CV(V) = 1
The value [V.sup.*] is the price at which it is optimal to invest.
At that time, the firm receives the difference [V.sup.*] - I. The
solution to the differential equation under the above conditions gives
the value of C(V). The solution under the first condition is:
C(V) = a [V.sup.[beta]] (9)
where a is a constant and:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (10)
The value of the constant a and the critical value [V.sup.*] are:
[V.sup.*] = [beta]I/[beta]-I, [alpha] = ([V.sup.*]-
I)/[([V.sup.*]).sup.[beta]] (11)
In Myers and Majd (1985), the sunk costs are related to the
decision to exit or abandon a project for different reasons including
severance pay for workers, and land reclamation for the case of a mine.
In the Brennan and Schwartz (1985) model, the decision to invest
contains the sunk cost of land reclamation. Following the work of Myers
(1984), Kester (1984) and Grenadier and Weiss (1997), the option-pricing
theory can be applied to real-investment decisions as well as to
strategies.
The innovation investment strategy can be viewed as a link in a
chain of future investment options. Grenadier and Weiss (1997) identify
four potential strategies (13).
V. THE VALUATION OF COMPOUND OPTIONS WITHIN INFORMATION COSTS
Several projects are often valued using the concept of compound
options introduced by Geske (1979). For example, the development process
for a new product requires several stages where the manager resorts to
the new information revealed up to that point to decide whether to
abandon or to continue the project. This is particularly the case for a
biotechnology firm for which the development of a drug needs several
stages.
The idea is that engaging in the development phase is equivalent to
buying a call on the value of a subsequent product. Hence, there is the
initial option and the growth option. In the presence of only two stages
a formula for a call on a call can be used. We show how to value
compound options in the presence of information costs. For the sake of
simplicity, we use the general context proposed by Geske (1979).
If the stock is considered as an option on the value of the firm,
V, then the value of the call as a compound option can be expressed as a
function of the firm's value. This analysis follows from the
setting in Geske (1979). As suggested by the referee, we can also apply
the model in Bellalah and El Farissi (2002) to show how to price options
with information costs by generalizing the approaches in Leland (1994)
and Leland and Toft (1996).
Following Geske (1979), consider a levered firm for which the debt
corresponds to pure discount bonds maturing in T years with a face value
M. Under the standard assumptions of liquidating the firm in T years,
paying off the bondholders and giving the residual value (if any) to
stockholders, the bondholders have given the stockholders the option to
buy back the assets of the firm at the debt's maturity date.
In this context, a call on the firm's stock is a compound
option, C(S,t) = f(g(V,t),t) where t stands for the current time.
Using the standard dynamics, the return on the firm's assets
follows the stochastic differential equation:
dV/V = [[sigma].sub.v]dt + [[sigma].sub.v]d[z.sub.v] (12)
Where [[alpha].sub.v] and [[delta].sub.v] refer to the
instantaneous rate of return and the standard deviation of the return of
the firm per unit time, and d[z.sub.v] is a Brownian motion.
Using the definition of the call C (V,t), its return can be
described by the following differential equation:
dC/C = [[alpha].sub.c]dt + [[sigma].sub.c]d[z.sub.c] (13)
where [[alpha].sub.c] and [[delta].sub.c] refer to the
instantaneous rate of return and the standard deviation of the return on
the call per unit time, and dzc is a Brownian motion. Using Ito's
lemma as before, the dynamics of the call can be expressed as:
dC = 1/2 [C.sub.vv][[sigma].sup.2.sub.v] + [C.sub.u]dV +
[C.sub.t]dt (14)
It is possible to create a riskless hedge with two securities, in
this case, between the firm and a call to get the following partial
differential equation:
1/2 [[sigma].sup.2.sub.v][V.sup.2][C.sub.vv] + (r+[[lambda].sub.v])
V[C.sub.u] - (r+[[lambda].sub.c]) C + [C.sub.t] = 0 (15)
where [[lambda].sub.v] in an information cost relative to the
firm's or the project's value. At the option's maturity
date, the value of the call option on the firm's stock must satisfy
the following condition:
[C.sub.t] = max [[S.sub.t] - K, 0] (16)
where K stands for the strike price. Investors suffer sunk costs to
get informed about the equity and the assets of the firm. The costs
regarding the equity and the firm's cashflows reflect the agency
costs and the asymmetric information costs. These costs characterize
also joint ventures. In this situation, the call formula is given by:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (17)
where M is the face value of debt. The value/bar{V} is determined
by the following equation:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (18)
with:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (19)
where N(.,.,.) refers to the cumulative bivariate normal
distribution. If the information cost is zero, this compound option
pricing formula becomes that in Geske (1979). This formula is also
useful for the valuation of real options in the presence of information
costs.
Table 8 provides the simulation results for the compound option
formula with information costs and the Geske's compound call
formula using the following parameters: K = 20, M = 100, r = 0.08, T
=0.25, t = 0.125, [delta]v = 0.4. The parameters used for information
costs are:
case a: ([lambda]c = [lambda]v = 0%),
case b: ([lambda]c = [lambda]v = 2%),
case c: ([lambda]c = 1%, [lambda]v = 2%),
case d: ([lambda]c = 1%, [lambda]v = 2%).
In case (a), we have exactly the same values as those generated by
the formula in Geske (1979). The table shows that the compound option
price is an increasing function of the firm's or the project's
assets. This result is independent of the values attributed to
information costs. The compound option price is an increasing function
of the information costs regarding the firm's assets, [lambda]v.
When [lambda]v is fixed, this allows the study of the effects of the
other information costs on the option value. In this case, the option
price seems to be a decreasing function of the information cost
[lambda]c. We intend to test this model on real data.
VI. RESEARCH AND DEVELOPMENT AND THE OPTION ON MARKET INTRODUCTION
IN THE PRESENCE OF INFORMATION COSTS
Several companies face the difficulty of selecting an optimal
portfolio of research projects. As it appears in the analysis of Lint
and Pennings (1998), the standard DCF techniques for capital budgeting
can distort the process of selecting a portfolio of research projects.
When managers have the option to abandon a project, it is possible to
think of the cost of R&D as an option on major follow-on
investments. Newton and Pearson (1994) provide an option pricing
framework for R&D investments. Lint and Pennings (1998) report the
application of an option pricing model for setting the budget of R&D
projects. Their model captures a discontinuous arrival of new
information that affects the project's value. R&D options can
be viewed as European when two conditions hold (14).
In the Lint and Pennings's (1998) model, the variance of the
underlying value [[sigma].sup.2] is given by the product of a parameter representing the number of annual business shifts [eta] and a parameter
[gamma] for the expected absolute change in the underlying value at
every business shift:
[[sigma].sup.2] = [eta] [[gamma].sup.2] (19)
Applying asymptotic theory, the option value can be approximated
with the Black and Scholes (1973) formula where [[sigma].sup.2] is
replaced by [eta] [[gamma].sup.2], or:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (20)
where S(t), r, T-t stand respectively for the underlying value at
present, the costs for market introduction, the risk free rate and the
option's time to maturity.
Lint and Pennings (1998) use their model in Philips and show that
the option value is largely determined by the opportunity to make a
final decision on market introduction with more technological and market
information. They show that the option value must compensate the R&D
costs necessary to create the option. Their estimation of the option
value of the potential benefits to market new products based on R&D
goes beyond myopic use of DCF analysis.
In the conclusion of their paper, they suggest to classify a
variety of past and current R&D projects into sets of similar risks
and returns. This can allow the estimation of the value of future
idiosyncratic R&D projects by option analysis as in Newton and
Pearson (1994). This line of research imposes an information cost in the
spirit of the costs in Merton's (1987) model of capital market
equilibrium with incomplete information (15).
It is possible to use the methodology in Lint and Pennings (1998)
and in Bellalah (1999) to account for the role of information costs. In
this case, the option value is given by:
C(S,T) = (S(t)[e.sup.-([lambda]c-[lambda]s)(T-t)]N(d + [square root
of ([eta](T-t)][gamma])-I[e.sup.-(r+[lambda]c)(T-t)]N(d)
d=[ln((S(t)/I) + (r+[lambda]s - 1/2
[eta][[gamma].sup.2])(T-t)]/[sigma][square root of ([eta](T-t))][gamma]
(21)
where [lambda]s and [lambda]c denote respectively the information
costs relative to S and C.
VII. THE VALUATION OF REAL OPTIONS AND R&D PROJECTS WITHIN
INFORMATION COSTS IN A DISCRETE-TIME SETTING
The majority of the papers concerned with the pricing of real
assets in a discrete time setting derive from the models for financial
options pioneered by Cox, Ross and Rubinstein (1979).
A. The valuation of a biotechnology firm using a discrete-time
framework within information costs
Following the analysis in Kellogg and Charnes (1999), the value of
the firm can be found also using the binomial lattice with the addition
of a growth option. The growth option is represented by a second
binomial lattice for a research phase. The current value of the asset S
(or [S.sub.0,0] is computed using the discounted value of the expected
commercialization cash flows to time zero as:
[S.sub.0,0] = S = [5.summation over (j=1)]qj[T.summation over
(t=1)] [(1+[r.sub.c]).sup.t]/CC[F.sub.jt] (22)
where the discount rate is estimated using Merton's CAPMI. The
number of stages can be arbitrarily any number.
It is possible to construct an n period binomial lattice of asset
values. The value of the underlying asset S goes up by u or down by d.
This multiplicative process is continued for n period until the n th
lattice.
Kellogg and Charnes (1999) use the fact that u = [e.sup.[sigma]]
and d = [e.sup.[-sigma]] and impose that h = Sul = [Se.sup.[sigma]l]
where l corresponds to a given number of years. They used an example in
which the periods are supposed to have a length of one year.
The next step is to add in the value of the growth option. The idea
is that engaging in the development phase is equivalent to buying a call
on the value of a subsequent product. Hence, there is the initial option
and the growth option. The value of the growth option at the time of the
launch of the first product is added to each of the Ek values of the
first NME.
Once the binomial tree of asset values is completed, it is possible
to compute the possible payoffs and roll back the values using the risk
neutral probabilities. The different payoffs are computed as:
[P.sub.k] = max [[E.sub.k]([[theta].sub.t] - DC[F.sub.t], 0] (23)
where [[theta].sub.t]: the probability of continuation to the next
year in t and DCFt: the R&D payment in year t.
The Pk values are rolled back by multiplying the adjacent values,
such as [P.sub.1] and [P.sub.2] (denoted by Vt+1, k and Vt+1, k+1) by
the risk neutral probabilities p and (1-p), the probability of
continuation to the next year and a discount factor to obtain Vt,k.
The risk neutral probabilities are calculated as: p =
[e.sup.(r+[lambda]s)[DELTA]t]-d/(u-d). As the option values are rolled
back, they are adjusted for the probability of success at that phase of
development and for the cost of development that year. The option values
can be obtained at each node as:
[V.sub.t,k] = max [(p[V.sub.t+1,k] +
(1-p)[V.sub.t+1,k+1)[[theta].sub.t][e.sup.-(r+[lambda]v)[square root of
([DELTA]t-)] - DCFt, 0] (24)
B. The generalization of discrete time models for the pricing of
projects and real assets within information uncertainty
Trigeorgis (1991) proposed a Log-transformed binomial model for the
pricing of several complex investment opportunities with embedded real
options. The model can be extended to account for information costs. The
value of the expected cash flows or the underlying asset V satisfies the
following dynamics:
dV/V = [alpha]dt + [sigma]dz (25)
Consider the variable X = log V and K = [[sigma].sup.2] dt.
If we divide the project's life T into N discrete intervals of
length, then K can be Approximated from [[sigma].sup.2] T/N. Within each
interval, X moves up by an amount [DELTA]X = H With probability [pi] or
down by the same amount [DELTA]X = -H with probability (1 - [product]).
The Mean of the process is E(dX)= [mu]K; and its variance is Var(dX) = K
with
[mu] = (r+[lambda]s)/[[sigma].sup.2] - 1/2. (26)
The mean and the variance of the discrete process are E([DELTA] X)=
2 [pi] H - H and Var([DELTA] X)= [H.sup.2] - [[E([DELTA]x].sup.2].
The discrete time process is consistent with the continuous
diffusion process when 2[pi]H - H = K with [mu] =
(r+[lambda]s)/[[sigma].sup.2] - 1/2 so [pi] = (1 + [mu]K/H) and
[H.sup.2] - [mu][K.sup.2] = K so that H = [square root of (K +
[([mu]K).sup.2])].
The model can be implemented in four steps. In the first step, the
cash flows CF are specified.
In the second step, the model determines the following key
variables: the time-step: the drift [mu] from
(r+[lambda]s)/[[sigma].sup.2]- 1/2, the state-step H from [square root
of (K + [([mu]K).sup.2]), and the probability [pi] from 1/2 (1 +
[mu]K)/H.
Let j be the integer of time steps (each of length K), i the
integer index for the state variable X (for the net number of ups less
downs). Let R(i) be the total investment opportunity value (the project
plus its embedded options). In the third step, for each state i, the
project's values are V(i) = [e.sup.(X0 + i H)]. The total
investment opportunity values are given by the terminal condition R(i) =
max[V(i), 0].
The fourth step follows an iterative procedure. Between two
periods, the value of the opportunity in the earlier period j at state
i, R'(i) is given by:
R'(i)= [e.sup.-(r+lambda]c)] (K/[[sigma].sup.2]) [[pi]R(i+1) +
(1-[pi]R(i-1)] (27)
In this setting, the values of the different real options can be
calculated by specifying their payoffs. The payoff of the option to
switch or abandon for salvage value S is R'= max(R,S).
The payoff of the option to expand by e by investing an amount I4
is R'= R+max (e V - I4,0). The payoff of the option to contract the
project scale by c saving an amount I3' is R'= R +
max(I3'- cV, 0). The payoff of the option to abandon by defaulting
on investment I2 is R'=max(R -I2,0). The payoff of the option to
defer (until next period) is R'= max(e [e.sup.-(r+[lambda]c)T]
E([R.sub.j+1]), Rj).
When a real option is encountered in the backward procedure, then
the total opportunity value is revised to reflect the asymmetry introduced by that flexibility or real option. This general procedure
can be applied for the valuation of several projects and firms in the
presence of information costs.
VII. SUMMARY
This paper provides the main results in the literature regarding
the valuation of the firm and its assets using the real option theory
when we account for the effects of information uncertainty.
We propose some simple models for the analysis of the investment
decision under uncertainty, irreversibility and sunk costs.
First, we use Merton (1987) model of capital market equilibrium
with incomplete information to determine the appropriate rate for the
discounting of future risky cash flows under incomplete information. The
context of incomplete information allows the extension of the standard
theory of firm valuation.
Second, we present the main potential applications of option
pricing theory to the valuation of simple and complex real options.
Third, we develop some simple models for the pricing of European and
American commodity options in the presence of information costs. We
propose also simple analytic formulas for the pricing of compound
options in the presence of information costs. These formulas are useful
in the study of the main results in the literature regarding the
investment timing and the pricing of real assets using standard and
complex options in the presence of incomplete information. The analysis
is extended to the valuation of research and development and the option
on market introduction. It is also applied to the valuation of
flexibility as a compound option in the same context. Fourth, a general
context is proposed for the valuation of real options and the pricing of
real assets in a discrete-time setting. Using the Trigeorgis (1991)
general Log-transformed binomial model for the pricing of complex
investment opportunities, we provide a context for the valuation of real
options under incomplete information. Our approach can be extended to
price most well-known real options in the presence of information costs.
While the estimation of the magnitude of these costs is done in Bellalah
and Jacquillat (1995) for financial options, it is possible to look for
a convenient approach to estimate these costs for real options. We let
this point for a future research.
APPENDIX
The valuation equations for a derivative security in the presence
of information costs
1. The valuation equations derivation of a Differential equation
for a derivative security on a spot asset in the presence of a
continuous dividend yield and information costs
Following the analysis in Bellalah (2001), we denote by C the price
of a derivative security on a stock with a continuous dividend yield
[delta].
The dynamics of the underlying asset are given by dS = [mu]Sdt +
[sigma]S dz, where the drift term \mu and the volatility \sigma are
constants and dz is a Wiener process.
Using Ito's lemma for the function C(S,t) gives
DC = ([partial derivative]C/[partial derivative]S [mu]S + 1/2
[[partial derivative].sup.2]C/[partial derivative] [S.sup.2]
[[sigma].sup.2][S.sup.2])dt + [partial derivative]C/[partial
derivative]S[sigma]Sdz (28)
It is possible to construct a portfolio \Pi by holding a position
in the derivative security and a certain number of units of the
underlying asset
[product] = -C + [partial derivative]C/[partial derivative]S S (29)
Over a short time interval, the change in the portfolio value can
be written as
[DELTA][product]= (-[partial derivative]C/[partial derivative]S
[mu]S - 1/2 [[partial derivative].sup.2]C/[partial derivative] [S.sup.2]
[[sigma].sup.2][S.sup.2])[DELTA]t (30)
Over the same time interval, dividends are given by [delta]S
[partial derivative]C/[partial derivative]S [DELTA]t. We denote by
[delta]W the change in the wealth of the portfolio holder. In this case,
we have
[DELTA]W = (-[partial derivative]C/[partial derivative]t - 1/2
[[partial derivative].sup.2]C/[[partial derivative].sup.2]
[[sigma].sup.2][S.sup.2] + [delta]S [partial derivative]C/[partial
derivative]S)[DELTA]t (31)
Since this change is independent of the Wiener process, the
portfolio is instantaneously risk-less and must earn the risk-free rate plus information costs or
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (32)
Where [[lambda].sup.i] refers to these costs. This gives
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (33)
This equation must be satisfied by the derivative security in the
presence of information costs and a continuous dividend yield.
2. The general differential equation for the pricing of derivative
assets with information costs
We consider the general case for the valuation of any contingent
claim with information cost. We denote by
--[[theta].sub.i]: value of ith state variable,
--[m.sub.i]: expected growth in ith state variable,
--[[gamma].sub.i]: market price of risk of ith state variable,
--[S.sub.i]: volatility of ith state variable,
--r: instantaneous risk-free rate,
--[[lambda].sub.i]: shadow cost of incomplete information of ith
state variable, where i takes the values from 1 to n.
As it is well known, the price of any contingent claim must satisfy
the following partial differential equation where [[rho].sub.i,j] stands
for the correlation coefficient between the variables and
[[theta].sub.i] and
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (34)
We can show as in Bellalah (2001) how to obtain a similar equation
in the presence of incomplete information. In this context, the equation
becomes
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (35)
In the presence of a single state variable, [theta], equation (2)
becomes
[partial derivative]C/[partial derivative]t + [theta] [partial
derivative]C/[partial derivative][theta]2 (m - [gamma]s) + 1/2
[s.sup.2][[theta].sup.2] [[partial derivative].sup.2]C/[[partial
derivative].sup.2][theta] = (r + [lambda])C (36)
For a non-dividend paying security, the expected return and
volatility must satisfy m - r - [lambda] = [gamma]s and m - [gamma]s = r
+ [lambda].
In this case, equation (36) becomes the extended Black-Scholes
equation in the presence of information costs.
For a dividend-paying security at a rate [delta], we have [delta] +
m - r - [lambda] = [gamma]s or m - [gamma]s = r
In this case, equation (36) becomes
[partial derivative]C/[partial derivative]t + (r + [[lambda].sub.s]
- [delta]) S [partial derivative]C/[partial derivative] + 1/2
[s.sup.2][S.sup.2] [[partial derivative].sup.2]C/[[partial
derivative].sup.2]S = (r + [lambda])C (37)
This equation is a generalization of the Black and Scholes (1973)
equation in the presence of information costs.
3. The valuation of simple European and American Commodity options
with information costs Following Black (1976), we assume that all the
parameters of the Merton's (1987) CAPMI are constant through time.
Under these assumptions, the value of the commodity option, C(S,t),
can be written as a function of the underlying price and time.
As suggested by the referee, we can use some limiting arguments as
in Bellalah and Prigent (2001) to show that the application of
Merton's (1987) model is possible in a continuous-time setting. We
can show as in Bellalah (1999) the following equation for the pricing of
commodity options:
1/2 [[sigma].sup.2][S.sup.2][C.sub.ss] + (b + [[lambda].sub.s])
S[C.sub.s] - (r + [[lambda].sub.c]C + [C.sub.t] = 0 (38)
When the information costs [lambda]S and [lambda]c are set equal to
zero, this equation collapses to that in Barone-Adesi and Whaley (1987).
The term b indicates the cost of carrying the commodity. The value of a
European commodity call is:
C(S,T) = S[e.sup.((b-r-([lambda]c-[lambda]s))T)]N([d.sub.1])-K
[e.sup.-(r+[lambda]c)T]N([d.sub.2]) (39)
where N(.) is the cumulative normal density function.
When [[lambda].sub.S] and [[lambda].sub.c] are equal to zero and b
= r, this formula is the same as that in Black and Scholes. A direct
application of the approach in Barone-Adesi and Whaley (1987), allows
writing down immediately the formulas for American commodity options
with information costs.
REFERENCES
Barone-Adesi G. and R.E. Whaley, 1987, "Efficient Analytic
Approximation of American Option Values," Journal of Finance, Vol.
XLII, No 2, 81, 303-320
Berger. P.G., E. Ofek, and I. Swary, 1996, "Investor valuation
of the Abandonment Option," Journal of Financial Economics 42,
257-287.
Bellalah, M. and B. Jacquillat, 1995, "Option Valuation with
Information Costs: Theory and Tests," Financial Review, 617-635.
Bellalah M., 1998, <<Finance Moderne d'entreprise>>, Economica, Paris.
Bellalah, M., 1999, "The Valuation of Futures and Commodity
Options with Information Costs," Journal of Futures Markets 19,
645-664
Bellalah, M. 2000, <<Strategies d'investissements
technologiques, options reelles et information. In Gestion des risques
dans un cadre International,>> Economica.
Bellalah, M. 2001, "On Irreversibility, Sunk Costs and
Investment under Incomplete Information," R&D Management
Journal, Vol. 31.
Bellalah, M. 2001, "A Re-examination of Corporate Risks under
Incomplete Information," International Journal of Finance and
Economics 6, 59-67.
Bellalah M., 2001, "Market Imperfections, Information Costs
and the Valuation of Derivatives: Some General Results,"
International Journal of Finance, Vol. 13, 1895-1928
Bellalah, M. 2002, "Valuing Lease Contracts under Incomplete
Information: A Real-Options Approach," The Engineering Economist,
Vol. 47, 193-211,
Bellalah, M. 2002, "On investment in Technological Innovations
under Incomplete Information," Real R&D Options, edited by Dean
Paxson, Chapter 10.
Bellalah, M. and J.L Prigent, 2001, "Pricing Standard and
Exotic Options in the Presence of a Finite Mixture of Gaussian
Distributions," International Journal of Finance, Vol 13, N 3,
1974-2000,
Bellalah, M. and El Farissi, 2002, "Corporate Debt Value and
Optimal Capital Structure with Shadow Costs of Incomplete
Information," Quarterly Journal of Finance-India, December,
1325-1357
Black, F. and M. Scholes, 1973, "The Pricing Of Options and
Corporate Liabilities," Journal of Political Economy, 81, 637-659.
Black, F., 1976, "The Pricing of Commodity Contracts,"
Journal of Financial Economics 79, Vol 3, 167-179.
Brealey, R.A. and S.C. Myers, 1985. Principles of Corporate
Finance, third edition. McGraw-Hill.
Brennan, M.J. and E. Schwartz, 1985, "Evaluating Natural
Resource Investments," Journal of Business.
Carr, P., 1988, "The Valuation of Sequential Exchange
Opportunities," Journal of Finance, Vol. XLIII, No. 2 December.
Copeland, T. and F. Weston, 1988, Financial Theory and Corporate
Policy, Addison Wesley, NY.
Cox, J. C. and M, Rubinstein, 1985, Options Markets, Prentice-Hall
Cox, J.C. and S.A. Ross and M. Rubinstein, 1979, "Option
pricing: A simplified Approach," Journal of Financial Economics 7,
No. 3, 229-263
Dixit, A.K, 1992, "Investment and Hysteresis," Journal of
Economic Perspectives, vol.6, no 1, Winter, 107-132
Dixit, A. K, 1995, "Irreversible Investment with Uncertainty
and Scale Economies," Journal of Economic Dynamics and Control, No.
19, 327-350
Dixit, A. and R.S. Pindyck, 1994, Investment under Uncertainty.
Princeton University Press
Dixit, A. K. and R. S. Pindyck, 1995, "The Options Approach to
Capital Investment," Harvard Business Review, May-June, 105-115
Fisher I., 1907, The Rate of Interest: Its Nature, Determination
and Relation to Economic Phenomena, New York: Macmillan Co.
Geske R., 1979, "The Valuation of Compound Options,"
Journal of Financial Economics 7, 375-380.
Grenadier, S.R. and A.M. Weiss, 1997, "Investment in
Technological Innovations: An Option Pricing Approach," Journal of
Financial Economics 44, 397-416.
Kellogg, D. and J.C. Charnes, 1999, "Using Real-Options
Valuation Methods for a Biotechnology Firm," Working Paper,
University of Kansas, School of Business,
Kester, W.C., 1984, "Today's Options for Tomorrow's
Growth," Harvard Business Review, March-April, 153-160
Kogut, B., 1991, "Joint Ventures and the Option to Expand and
Acquire," Management Science, Vol. 37, No. 1, January.
Leland, H., 1994, "Coporate Debt Value, Bond Covenants and
Optimal Capital Structure," Journal of Finance, Vol 4, September.
Lint, O. and E. Pennings, 1998, "R&D as an Option on
Market Introduction," R&D Management 28, 4, pp 297-287.
Luehrman, T., 1997, "A General Guide to Valuation,"
Harvard Business Review, May-June, 132-142
Luehrman, T., 1998, "Investment Opportunities as Real Options:
Getting Started on the Numbers," Harvard Business Review,
July-August.
Majd, S. and R. Pindyck, 1987, "Time to Build, Option Value,
and Investment Decisions," Journal of Financial Economics, pp 7-27.
McDonald, R. and D. Siegel, 1984, "Option Pricing When the
Underlying Assets Earns A Below-equilibrium Rate of Return: A
Note," Journal of Finance.
McDonald, R. and D. Siegel, 1986, "The Value of Waiting to
Invest," Quarterly Journal of Economics, 101, 707-728.
Merton, R.C., 1973, "Theory of Rational Option Pricing,"
Bell Journal of Economics and Management Science 4, pp. 141-183
Merton, R.C., 1992, Continuous Time Finance, Blackwell publishers
Merton, R.C., 1987, "A Simple Model of Capital Market
Equilibrium with Incomplete Information," Journal of Finance 42,
483-510.
Modigliani, F. and M. Miller, 1958, "The Cost of Capital,
Corporation Finance and the Theory of Investment," American
Economic Review, June, 261-279.
Modigliani, F. and M. Miller, 1963, "Corporate Income Taxes
and the Cost of Capital," American Economic Review, June, 433-443,
Myers, S.C., 1984, "Finance Theory and Financial
Strategy," Interfaces, 14:1, Jan-Feb., 126-137.
Myers, S. and S. Majd, 1990, "Abandonment Value and Project
Life," Advances in Futures and Options Research, 4, 1-12.
Newton, D. 1996, "Opting for the Right Value for
R&D," The Financial Times, June 28.
Paddock, J., D. Siegel and J. Smith, 1988, "Option Valuation
of Claims on Real Assets: The Case of Offshore Petroleum Leases,"
Quarterly Journal of Economics.
Pindyck, R. S., 1991, "Irreversibility, Uncertainty, and
Investment," Journal of Economic Literature, Sept., pp. 1100-1148
Pindyck, R.S., 1988, "Irreversible Investment, Capacity
Choice, and the Value of the Firm," American Economic Review 78,
1988, pp.969-985.
Sharpe, W.F., 1964, "Capital Asset Prices: A Theory of Market
Equilibrium under Conditions of Risk," Journal of Finance, 425-442.
Siegel, D., J. Smith, and J. Paddock, 1987, "Valuing Offshore
Oil Properties with Option Pricing Models," Midland Corporate
Finance Journal, pp 22-30.
Smith, J. E. and R. F. Nau, 1994, "Valuing Risky Projects:
Option Pricing Theory and Decision Analysis," Management Science,
Vol. 41, No. 5, May
Trigeorgis, L., 1990, "A Real Option Application in
Natural-Resource Investments," Advances in Futures and Options
Research, Vol. 4, 153-156
Trigeorgis, L., 1993a, "The Nature of Options Interactions and
the Valuation of Investments with Multiple Real Options," Journal
of Financial and Quantitative Analysis, Vol.28, no 1, March, 1-20
Trigeorgis, L., 1993b, Real Options in Capital Investments, Models,
Strategies, and Applications, Praeger Publishers, Westport
Trigeorgis, L. 1993c, "Real Options and Interactions with
Financial Flexibility," Financial Management 22, Autumn, 202-224
Trigeorgis, L. 1996, Real Options, Managerial Flexibility and
Strategy in Resource Allocation, The MIT Press.
ENDNOTES
(1.) This paper benefits from the comments of professors Gordon
Sick, Lenos rigeorgis and the participants in the real option conference
in Cyprus, July 2002. I would like to thank Professors Richard Roll,
Giovanni Barone-Adesi and Robert Webb and an anonymous referee for their
helpful comments.
(2.) For a survey of important results in the literature, the
reader can refer to Brealey and Myers (1985), Copeland and Weston
(1988), Smith and Nau (1994) and Bellalah (1998) among others.
(3.) For a survey of the important results in the standard
literature regarding option pricing, the reader can refer to Black and
Scholes (1973), Merton (1973, 1992), Cox, Ross and Rubinstein (1979),
Cox and Rubinstein (1985), Hull (2000), Briys-Bellalah et al. (1998)
among others.
(4.) For a survey of the literature on real options, the reader can
refer to Trigeorgis (1990, 1993 a, b, c, 1995, 1996), Pindyck (1991),
Padock, Siegel and Smith (1988), Myers (1984), McDonald and Siegel
(1984, 1986), Myers and Majd (1990) among others.
(5.) For a review of the main results in this literature, the
reader can refer to Luehrman (1997, 1998), etc.)
(6.) The main element in the determination of profitability in
certain cyclical activities is the ability of timing a business cycle to
build for example a new factory. The manager does not have to commit
himself outright to a new factory. He has the option of staging the
investment over a given period by paying a certain amount up front for
design, another amount in a period for pre-construction work and an
other outlay to complete construction at the end of the year. This gives
him the flexibility to walk away if profit projections fall below a
given level or to abandon at the end of the initial construction phase
and save a given additional outlay. The factory is designed to convert
an input into an output and its profitability would be a function of the
spread between these prices. The manager can invest in new factories
only when the input output spread is higher than its long-term average.
The NPV assumes that the factory is built and operated, ignoring the
flexibility offered to managers
(7.) In general, learning options appear when a company has the
possibility to speed up the arrival of information by making an
investment. Real option theory can be used to determine the optimal time
to exercise the option. When the company does not know the quantity of
ore in its mine, it has a learning option: to pay money to find out.
Here also, the main models for the pricing of exotic options can be
applied.
(8.) Consider a company deciding on how much production capacity to
install in an undeveloped natural gas field. The company can create a
decision tree for a real option valuation model (ROV) to weigh up the
various decisions in view of the uncertainty regarding the price and
quantity. Using the information regarding the volatility of gas prices
and quantity, the ROV model can estimate the total value of the
different courses open to the company. The reader can refer to the work
of Brennan (1991), Brennan and Schwartz (1985), Pickles and Smith
(1993), etc.
(9.) Consider a pharmaceutical company ranking different R&D
projects in order of priority. The real option approach handles both
uncertainties. R&D projects can be classified as compound rainbow
options, each contingent on the preceding options and on multiple
sources of uncertainty (rainbow options and multi factor options). In
this context, the models for the pricing of exotic options can be
applied. For the general approach regarding the pricing of these
options, the reader can refer to Bellalah (2002).
(10.) These models undermine the theoretical foundation of standard
neoclassical investment models and invalidate the net present value
criteria in investment choice under uncertainty. For a survey of this
literature, the reader can refer to Pindyck (1991) and the references in
that paper.
(11.) Unlike standard options, this call is perpetual and has no
expiration date. This result is used in McDonald and Siegel (1986) and
Pindyck (1991). In this context, the investment opportunity is
equivalent to a perpetual call. The decision regarding the timing of the
investment is equivalent to the choice of the exercise time of this
option
(12.) Pindyck's (1991) presents a survey of some applications
of this theory to a variety of investment problems.
(13.) For an extension of their model to account for the effects of
incomplete information, see Bellalah (2001, 2002).
(14.) Lint and Pennings (1998) assume that the costs associated
with the irreversible investment, required for market introduction, and
the time for completing R&D are given with reasonable accuracy. By
ignoring dividends, they propose a simple model which is an extension
for R&D option pricing in practice. The approach in Lint and
Pennings (1998) is based on a discontinuous arrival of information
affecting the project.
(15.) These costs are discussed in Bellalah and Jacquillat (1995)
and Bellalah (1999) for the pricing of financial options
Mondher Bellalah (a) and Georges Pariente (b)
(a) THEMA, University de Cergy 33 boulevard du port, 95 011 Cergy,
France Mondher.Bellalah@eco.u-cergy.fr
(b) ISC Paris, France
Table 1
Call options values using the following parameters:
K =100, r=0.08, t=0.25, [sigma] =0.4
Incomplete Information
Black & Scholes .01, .001 .01, 0 .03, .001
S:70 .0000 .0000 .0000 .0000
S:80 .9800 .9829 .9775 .9780
S:90 .8972 4.1189 4.1103 4.0984
S:100 5.0177 8.9085 8.8941 8.8641
S:110 12.6520 15.6119 15.5912 15.540
S:120 22.0877 23.660 23.7409 23.6489
([lambda]s, [lambda]c)
Black & Scholes .03, 0 .2, .01 .2, 0
S:70 .0000 .0000 .0000 .0000
S:80 .9800 .9727 .9374 .9322
S:90 .8972 4.0898 3.9278 3.9196
S:100 5.0177 8.8497 8.4953 8.4815
S:110 12.6520 15.5134 14.887 14.867
S:120 22.0877 23.6225 22.664 22.639
Table 2
Call options values using the following parameters:
K =100, r =0.08, t=0.5, [sigma] =0.2
Incomplete Information
Black & Scholes .01, .001 .01, 0 .03, .001
S:70 .0000 .0000 .0000 .0000
S:80 .9800 .0000 .0000 .0000
S:90 0.8972 2.7336 2.7174 2.7064
S:100 5.0177 7.7024 7.6705 7.6257
S:110 12.6520 15.2463 15.1936 15.0887
S:120 22.0877 24.2790 24.2223 24.0374
([lambda]s, [lambda]c)
Black & Scholes .03, 0 .2, .01 .2, 0
S:70 .0000 .0000 .0000 .0000
S:80 .9800 .0000 .0000 .0000
S:90 .8972 2.6904 2.4859 2.4712
S:100 5.0177 7.5942 7.0044 6.9754
S:110 12.6520 15.0425 13.856 13.816
S:120 22.0877 23.9814 22.078 22.0227
Table 3
Call options values using the following parameters:
K=100, r=0.12, t=0.25, [sigma] =0.2
Incomplete Information
Black & Scholes .01, .001 .01, 0 .03, .001
S:70 .0000 .0000 .0000 .0000
S:80 .9800 .0000 .0000 .0000
S:90 0.8972 2.7336 2.7174 2.7064
S:100 5.0177 7.7024 7.6705 7.6257
S:110 12.6520 15.2463 15.1936 15.0887
S:120 23.0877 23.0110 22.2223 21.0374
([lambda]s, [lambda]c)
Black & Scholes .03, 0 .2, .01 .2, 0
S:70 .0000 .0000 .0000 .0000
S:80 .9800 .0000 .0000 .0000
S:90 0.8972 2.6904 2.4859 2.4712
S:100 5.0177 7.5942 7.0044 6.9754
S:110 12.6520 15.0425 13.856 13.816
S:120 23.0877 21.9230 21.038 21.011
Table 4
Europeen futures call values using the following parameters:
K=100, r=0.08, T=0.25, [sigma] = 0.2
Complete Information Black's model Incomplete Information model
Futures price Option price [lambda]c = 1% [lambda]c = 5%
F = 70 0.0000 0.0000 0.0000
F = 80 0.0000 0.0000 0.0000
F = 90 0.4363 0.4353 0.4310
F = 100 3.8990 3.8990 3.8602
F = 110 10.7627 10.7260 10.6290
F = 120 19.7754 19.7260 19.5290
Table 5
Europeen futures call values using the following parameters:
K=100, r =0.12, T = 0.25, [sigma]= 0.2
Complete Information Black's model Incomplete Information model
Futures price Option price [lambda]c = 1% [lambda]c = 5%
F = 70 0.0000 0.0000 0.0000
F = 80 0.0000 0.0000 0.0000
F = 90 0.4320 0.4353 0.4267
F = 100 3.8698 3.8990 3.8217
F = 110 10.6556 10.6260 10.5237
F = 120 19.5786 19.5260 19.3354
Table 6
Europeen futures call values using the following parameters:
K=100, r=0.08, T=0.5, [sigma] =0.2
Complete Information Black's model Incomplete Information model
Futures price Option price [lambda]c = 1% [lambda]c = 5%
F = 70 0.0000 0.0000 0.0000
F = 80 0.0000 0.0000 0.0000
F = 90 1.5913 1.5833 1.5520
F = 100 5.4161 5.3890 5.2823
F = 110 11.7525 10.6939 11.4235
F = 120 19.9557 19.8562 19.4630
Table 7
Simulation and comparison of the Black and Scholes model and
our model for the values of European equity options.
V [lambda]c=[lambda]v=0 [lambda]c= 0.1%, [lambda]v= 1%
70 0.000 0.000
80 0.9800 0.9829
90 4.1206 4.1189
100 8.9163 8.9085
110 15.6302 15.6119
120 23.8003 23.7660
V [lambda]c=0%, [lambda]v=1% [lambda]c= 0.1%, [lambda]v= 3%
70 0.000 0.000
80 0.9775 0.9780
90 4.1103 4.0984
100 8.8941 8.8641
110 15.5912 15.5340
120 23.7409 23.6489
Notes: The following parameters are used: M = 100, r = 0.08,
T = 0.25, [delta]v= 0.4
Table 8
Simulation of equity values as compound options in the presence of
information costs using our model for the following parameters
C0 [lambda]c=0% [lambda]v=0% [lambda]c=2% [lambda]v=2%
110 6.82 7.13
120 15.17 15.65
130 26.52 27.16
C0 [lambda]c=1% [lambda]v=2% [lambda]c=1% [lambda]v=2%
110 7.16 7.14
120 15.70 15.67
130 27.25 27.20
Notes: The following parameters are used: K = 20, M = 100, r = 0.08,
T =0.25, t = 0.125, [delta]v= 0.4