Windmill farm assembly process using a MRP model.
Prostean, Gabriela ; Taucean, Ilie ; Mihai 等
1. INTRODUCTION
Wind energy is among the world's fastest-growing sources of
energy. The wind turbine sector is growing rapidly both with regards to
the number of installed wind turbines, and the capacity of newly
developed and manufactured machines (Torsten, 2009). A wind turbine is a
machine that converts the wind's kinetic energy into rotary
mechanical energy, which is then used to do work. In more advanced
models, the rotational energy is converted into electricity, the most
versatile form of energy, by using a generator (Moubayed, 2009).
Windmill farms are arrays of windmill set in areas of favorable
wind production. The great number of interconnected windmill is
necessary in order to produce enough electricity to meet the needs of a
sizable population.
The transportation and installation/assembly of wind mill
components are crucial phases for a wind farm project. Booming demand in
the wind industry has focused attention on the complex supply chain of
components which lies behind every mill delivered to the market. There
where bottlenecks in delivering and the production have to catch up
(Supply Chain: The race to meet demand, 2007).
Despite the transformation of the turbine manufacturing sector into
a streamlined, efficient mass producer of high tech equipment, it has
found it difficult to keep up with the surge in demand. The result has
been some customers unable to source turbines for their projects and a
rise in prices.
2. ASSEMBLING PROCESS
A typical wind turbine will contain up to 8,000 different
components (Supply Chain: The race to meet demand, 2007). To cope with
the continuing uncertainty of supply, some turbine manufacturers have to
make difficult strategic decisions about whether or not to produce more
of their components in-house. The leading manufacturers have
historically produced all their main components within their own
business structure.
GE, on the other hand, has outsourced more, including its blades,
considered by many to be the most vital component. Outsourcing raises
issues not just of secure supply but of quality control and design
confidentiality.
2.1 Components/parts
A windmill (WM) consists of three basic parts (Wind Turbine, 2010):
the tower (T), the nacelle (N), and the rotor blades (RB). The tower is
either a steel lattice tower similar to electrical towers or a steel
tubular tower (TT) with an inside ladder (L) to the nacelle.
Most towers do not have guys, which are cables used for support,
and most are made of steel that has been coated with a zinc alloy for
protection, though some are painted instead.
The nacelle is a strong, hollow shell that contains the inner
workings. Usually made of fiberglass, the nacelle contains the main
drive shaft (MDS) and the gearbox (GB). It also contains the blade pitch control (BP), a hydraulic system that controls the angle of the blades,
and the yaw drive (Y), which controls the position of the turbine
relative to the wind. The generator (G) and electronic controls (EC) are
standard equipment whose main components are steel and copper.
Wind turbines also include a utility box (UB), which converts the
wind energy into electricity and which is located at the base of the
tower. Various cables connect the utility box to the nacelle, while
others connect the whole turbine to nearby turbines and to a
transformer.
2.2 The Assembling Process
The final assembly process of a windmill is made at the site of the
farm and start with the preparation of the site (roads cut, land graded
and leveled). Then a concrete foundation is made with the underground
cables.
The tower is assembled on site and erect with a special crane. The
fiberglass nacelle is assembled with inner workings off site (main drive
shaft, gearbox, and blade pitch and yaw controls). At the site, the
nacelle is lifted onto the completed tower and bolted into place.
The blades are usually bolted onto the nacelle after it has been
placed onto the tower.
The utility box for each wind turbine and the electrical
communication system are installed simultaneously with the placement of
the nacelle and blades.
3. CASE STUDY
The development and maintenance of windmill farm must be realized
by elimination of numerous subcontractors in order to minimize delays in
production, transportation and installation, for cost cutting and energy
efficiency. The aim of this study was to improve the supply of part for
windmill, improving the assembly planning system and to avoid waiting
time and bottlenecks, to reduce the total time.
Material requirements planning (MRP) is a production planning and
inventory control system used to manage manufacturing processes (Reid,
2002). Most MRP systems are software-based, while it is possible by hand
as well.
An MRP system is intended to meet objectives such as: ensure
materials and products are available for production and delivery to
customers; plan manufacturing activities, delivery schedules and
purchasing activities.
For the MRP model we need the bill of materials (BOM). A bill of
materials is a list of the raw materials, sub-assemblies, intermediate
assemblies, sub-components, components, parts and the quantities of each
final product.
[FIGURE 1 OMITTED]
A BOM can also be visually represented by a product structure tree.
For our case, the figure 1 present the bill of materials
(simplified) for a windmill and the table 1 present a MRP model that can
be use for the final assembly process at a windmill farm site.
This simplified MRP model use for input the following information:
bill of materials/components, quantity needed for every part (P) and
assembly time (T).
The output is the time schedule for components, what, when and how
many are necessary for a windmill farm of 25 wind turbine. The total
time needed for this case is 9 weeks and the table 1 shows for each
component/assemblies when is the due date (D) and when is necessary to
start the assembly process (N).
This MRP model has minimum but sufficient input and output
information for assembly process planning. Next, there can be use a
similar model for their sub-assemblies, subcomponents, components,
parts, raw materials and so on. This way it is easy to read the models
and can focus on the specific issue when is needed.
This MRP model can be extend to include information such as: batch
size (optimum for production/transportation), stock level, quantity
needed when we have already a stock, supply rules, production
(manufacturing) time and transportation time (to integrate information
from suppliers).
The benefits of this model are the simplicity, easy to track and
evaluate components requirements, a database of components but with
limited decision capability. Other limitations of the model are the:
accurate and up-to-date inputs (schedules, bill of materials, inventory
records) and integrity of data.
4. CONCLUSIONS
We proposed here a way of analyzing and a MRP support tool for
planning process for a windmill farm.
With all the given information presented on the table, the
production managers can decide the optimum way for assembling process,
for a maximum of productivity, or for a maximum of workplace loading,
for a minimum of workers. Here is very important to integrate also
information from suppliers or for own production lines for components,
to known exactly when all components are available.
The integrated methodology provides a feasible way to build an
automated process planning.
The dynamic scheduling for assembly process is solved incrementally
before it expands into a large problem and the complexity of the problem
is reduced.
The future research plans, based on the customized MRP model will
approach:
--An estimate of the operations and maintenance cost of the project
broken down over the main accounts;
--A comparative analysis reports, describing the different
operating conditions of a generic turbine and how these should be
recorded and used to calculate availability.
5. REFERENCES
Moubayed, N.; Bernard, M.; El-Jamal, M.H.; El-Ali, A. & Outbib,
R. (2009). Requirements change using product lifecycle management for
wind turbine manufacturing processes, Journal of ARISE, July/September
2009, ISSN 1994-3253, www.arabrise.org/articles/2009-3-04-REEF.pdf
Reid, R.D. & Sanders, N.R. (2002). Operations Management, John
Wiley & Sons, pp. 457^458, ISBN 0-471-32011-0
Torsten, M. (2009). 20 Years of Wind Turbines: An Industry Running
on Prototypes?, Renewable Energy World Magazine, Vol. 12, No.1, March
2009, Upshire, UK
*** (2007) Supply Chain: The race to meet demand, Wind Directions,
January/February 2007, pp.27-34, Available from: www.ewea.org, Accessed
on: 2010-07-20
*** (2010) Wind Turbine, http://www. madehow.com/Volume1/Wind-
Turbine.html#ixzz0pL31cVxr, Accessed on: 2010-07-16
Tab. 1. MRP model for a windmill farm
Reference 1 2 3 4 5 6 7 8 9
W 1 D 25
M 2 N 25
T 1 D 25
2 N 25
N 1 D 25
3 N 25
RB 3 D 75
1 N 75
TT 1 D 25
1 N 25
UB 1 D 25
1 N 25
C 1 D 25
2 N 25
L 1 D 25
1 N 25
M 1 D 25
DS 1 N 25
GB 1 D 25
2 N 25
BP 1 D 25
2 N 25
Y 1 D 25
2 N 25
G 1 D 25
3 N 25
EC 1 D 25
1 N 25