1. INTRODUCTION
The evaluation and testing of system in early stages of software
development lifecycle is becoming important field of software
engineering. The research in testing of functional requirements is well
developed but the testing of non-functional requirements is still in the
beginning. One of the most important non-functional requirements, which
cannot be missed out when designing software system, is reliability.
There exist several traditional approaches for reliability assessment of
software systems but they have these main disadvantages:
1. Assessment of the reliability at the very end of software
development lifecycle
2. Reliability evaluation of system as whole
3. Various reliability modelling techniques (reliability block
diagrams, fault trees, Markov chains, etc.)
Our research focuses on developing the new reliability assessment
approach which will evaluate the reliability of the system in early
development stage using UML notations for modelling the assessed
software system. First step of the research was to explore the work done
in this field and to confirm the hypothesis that UML notations are
appropriate for reliability assessment.
2. RELIABILITY ASSESSMENT USING UML MODELS
2.1 Approach Cortellessa et al.
This approach (Cortellessa et al., 2002) can assess reliability
from early stage of software development lifecycle. It uses annotated
UML diagrams:
1. Use Case diagram
2. Sequence diagram
3. Deployment diagram.
Use Case diagram is annotated as follows:
* [q.sub.1] and [q.sub.2] represent the probabilities of requesting
services from system for users [u.sub.1] and [u.sub.2]
* [P.sub.11] and [P.sub.12] represent that user [u.sub.1] requests
the functionality [f.sub.1] represented by use case [uc.sub.1] or
[f.sub.2] represented by use case [uc.sub.2]
[FIGURE 1 OMITTED]
Then the probability of executing general use case x is:'
P(x) = [m.summation over (i=1) [q.sub.i] x [P.sub.ix] (1)
where m is the number of user types.
Then they assume that for each use case there are specified all
relevant Sequence Diagrams representing main scenarios each use case.
These sequence diagrams have the non-uniform probability distribution according to following equation:
P([k.sub.j]) = p(j) x [f.sub.j] (k) (2)
where [f.sub.j](k) is the frequency of the k-th overall the
sequence diagrams referring to the j-th use case and parameter
P([k.sub.j]) represents the probability of a scenario execution.
In sequence diagram, the approach focuses on the interval where the
component is busy. For example, in Figure 2 the interval, when component
[C.sub.3] is busy, is between the moment when interaction [l.sub.j]
enters the component and interaction [l.sub.2] leaves the component. The
total number of busy periods of component [C.sub.3] is 2.
[FIGURE 2 OMITTED]
Then the estimate of the probability of failure [[theta].sub.ij] of
the component [C.sub.i] in the scenario j represents the next equation:
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (3)
where [bp.sub.ij] the number of busy periods that component
[C.sub.i] has in the scenario j.
[FIGURE 3 OMITTED]
The deployment diagram in Figure 3 includes the same components
from the sequence diagram. The subject of failure probability
[[psi].sub.i] is every communication between components (l, m) through
the connector i. and [absolute value of Interact(l, m, j)] represents
the number of interactions between components l and m from the scenario
(sequence diagram) j. e.g. there exist 2 interactions exchanged between
[C.sub.2] and [C.sub.3] but only 1 interaction between [C.sub.1] and
[C.sub.2].
Then the contribute [[psi].sub.imj] to the reliability of
communication between all these components over the connector i in the
scenario j is:
[[psi].sub.lmj] = [(1 - [[psi].sub.i]).sup.[absolute value of
Interact(l,m,j)]] (4)
Finally the reliability of the whole system is combination is
combination of equation (3) and (4)
[MATHEMATICAL EXPRESSION NOT REPRODUCIBLE IN ASCII] (5)
2.2 Approach of Rodrigues et al.
This approach can also be used in early stages of software
development lifecycle for component-based systems. As basic modelling
techniques, the scenarios and a Message Sequence Charts (MSC) are used
(Rodrigues et al., 2005). The framework of the approach shows the Figure
5.
[FIGURE 5 OMITTED]
First step is annotation the MSCs with two kind probabilities:
1. Probability of transitions between scenarios [PTS.sub.ij]
2. Reliability of the components [R.sub.C].
PTS is simply the probability that scenario [S.sub.j] will be
executed after executing scenario [S.sub.i] which value comes from an
operational profile for the system (Musa, 1993). It is annotated on
High-level Message Sequence Charts (HMSC).
The component reliability [R.sub.C] is the probability that
component C will successfully perform its service which is invocated by
message from another component. The execution time of the service is not
significant for component reliability assessment. Component reliability
is annotated on Basic Message Sequence Charts (BMSC).
Second step is to made synthesis of Labelled Transition System
(LTS) from annotated scenarios. This step consists of several sub-steps
to construct the architecture model of the system.
In the third step the architecture model is interpreted as Markov
model. First the mapping of the probability weights from architecture
model into a square transition matrix is constructed.
In the fourth step the Cheung approach (Cheung, 1993) is used to
determine the reliability prediction of the whole system.
In last step, the implied scenarios are searching. These scenarios
can be found as the result of the fact that in the system there can
exist such set of components that don't communicate exclusively
through the interfaces described and that can exhibit via unspecified
traces when running in parallel (Uchitel, 2004). Founding of these
scenarios has impact on step 1 and 2 of the approach's framework.
4. CONCLUSION
The present research made in this area shows that UML modelling
techniques are applicable for reliability assessment of software.
We made also some thesis and assumptions:
* Sequence diagrams will be the core modelling technique for system
architecture and behaviour
* We assume that developing of new UML extensions will be necessary
for reliability assessment
* Our new approach will combine traditional reliability techniques
with UML modelling
* The whole process of our reliability assessment approach will be
automatic as much as possible
* The new tool which will cover our approach will be developed
* The approach will be developed with focus on control systems
software
In this paper we discuss the area of software reliability and its
support in UML. We also introduce the today's main approaches and
concepts in this area, make the short evaluation of them and outlook the
basis of our future work in this area.
5. REFERENCES
Cheung, R. C. (1980) A User-Oriented Software Reliability Model.
IEEE Transactions on Software Engineering, vol. 6(2), pp. 118-125
Cortellessa, V., Singh H., Cukic, B. (2002). Early reliability
assessment of UML based software models. Proceedings of the 3rd
international workshop on Software and performance, Rome, Italy
Musa, J. D. (1993). Operational profiles in software-reliability
engineering. IEEE Software, vol. 10, no. 2, pp. 14-32
Rodrigues, G. N., Rosenblum, D. S., Uchitel, S. (2005). Reliability
prediction in model-driven development. Proceedings of the 8th
international conference MoDELS pp. 339-354, Montego Bay, Jamaica
Uchitel, S., Kramer, J., Magee, J. (2004). Incremental Elaboration
of Scenario-Based Specifications and Behavior Models Using Implied
Scenarios. ACM Transactions on Software Engineering and Methodologies,
vol. 13, pp. 37-85