Measuring shifts base to calibrate test equipment GNSS.
Mikolas, Milan ; Dandos, Rostislav ; Subikova, Marie 等
Introduction
The test base Skalka, originally a national satellite station, is
located in the village of Kostelni Strimelice. Originally, this part of
the Pecny geodetic observatory was used to observe artificial Earth
satellites; since 2000, the base Skalka has been used to test the
functionality of GNSS apparatus.
The Skalka base lies mainly on bedrock of the Skalka hill. From the
geological point of view, it is a very stable area, but still the base
stability must be inspected and surveyed on a regular basis. The base is
also measured by the GNSS technology when the survey results are used to
draw up calibration protocols. These measurement results are not
included in the stability assessment as they are the result of the
testing complex "meter + software + GNSS equipment".
When testing the complex, the survey method (the accuracy of
centration over points of the outer base, the method of determining the
antenna height) and the subsequent data processing are assessed. Based
on the size of deviations between reference and determined coordinates,
calibration protocols must be drawn up. As the reference coordinates,
the coordinates and heights determined using classical geodetic methods
with high precision are taken.
1. History and primary purpose of geodetic base Skalka
The Geodetic Observatory Skalka, originally the National Satellite
Station Skalka, was built as an out-station of the Geodetic Observatory
Pecny from 1962 to 1966 (VUGTKa n.d.). The main idea of the station was
the utilization of the National Satellite Station for observations of
artificial Earth satellites. Originally, the station should be located
in the area of the Geodetic Observatory Pecny, but due to filling the
observatory with astronomical instruments and observational houses
preventing a good view to the horizon, the satellite station was built
on a bare hill of Skalka.
The satellite observations at the Skalka station were performed
mainly by means of a photogrammetric method using stationary chambers
Rb-75, Fig. 1. In 1969 (VUGTKa n.d.), the position of Sankovsky Grun in
the eastern Slovakia in relation to a point on Skalka was experimentally
determined, using simultaneous observations of artificial Earth
satellites. In 1969, the satellite chamber SBG (producer Carl-Zeiss Jena
(GDR)) was installed at the observatory. In 1970, the first Czechoslovak
laser rangefinder to measure the distances to satellites was tested in
this chamber, see Fig. 2. The rangefinder was equipped with a pulsed
laser; the optical system of the chamber was then adapted for receiving
reflected signals.
[FIGURE 1 OMITTED]
[FIGURE 2 OMITTED]
In the years 1984-1989, groups of surveyors from the USSR performed
two surveying campaigns of Doppler observations of NNSS Transit
navigation satellites on Skalka. The photographic methods for monitoring
artificial Earth satellites were completed in 1990. In 1991, the first
GPS receiver was obtained, which was installed at the Geodetic
Observatory Pecny. The receiver was used for GPS measurements in
networks and for experiments only, and thus the primary importance of
the Skalka station, i.e. observations of artificial Earth satellites,
fell off. Since 1995, permanent GPS observations have been made at the
Geodetic Observatory Pecny, performed mainly for the International GNSS
Service (IGS). The data from permanent observations is sent e.g. to the
GDDIS data centre where the data is used to determine the parameters of
rotation of Earth and orbits. In 1999-2000, the base for testing GNSS
equipment was built at the Geodetic Observatory Skalka, and thus its
importance for the field of satellite geodesy increased again.
2. Skalka, test base for GNSS equipment
Test test base Skalka, Fig. 3, was built in 1999 by the Research
Institute of Geodesy, Topography and Cartography in the area of the then
Astronomical and Geodetic Observatory. The reason for building the base
was the need to authenticate the GPS apparatus functionality, user
software as well as the way of measurement by means of the apparatus and
the subsequent evaluation of the measured data.
The base is divided into 3 parts--an inner base, outer base and
connecting base. Each part of the base has different monumentation and
performs different functions as well.
The inner part of the base is formed by five pillars with a forced
centring system. The distribution of the pillars network is adapted to
suit the requirement to ensure a free horizon above the horizon of about
10[degrees] as well as mutual visibility between the pillars. The
coordinates of this part of the base are designed with the greatest
possible precision. The maximum distance between the points is 224 m and
the elevation is about 21 m. Two raised pillars spaced about 3 m are a
part of the inner base. These pillars are used to identify positions of
phase centres.
[FIGURE 3 OMITTED]
The outer base consists of three points of photogrammetric testing
field control, levelling point and trigonometric point. The points are
monumented with granite beams and fitted with a protective stave. This
part of the base is used for verifying practical use of GPS (Vitaskova,
Stankova 2004) by means of a tripod and also for measuring the antenna
height above the point.
The connecting base consists of the GOPE station of IGS and EUREF permanent services, and then the trigonometric point Pecny (which was
used in the first international GPS campaign in Czechoslovakia
EUREFCS-H/91 in 1991(Stankova, Cernota 2010). The GOPE point is the
reference point of the International Terrestrial Reference System (ITRS), which enables accurate connecting test measurements to the
current geocentric system. According to (VUGTKb n.d.), the Pecny point
is monumented with a granite prism sealed to the base of the surveying
tower with concrete. On the upper gallery, there is a central pillar of
the tower, which is used for weighing the trigonometric point. Six
pillars are symmetrically deployed around the central pillar. The Pecny
point is secured with four locking points.
3. Monitoring base stability
The term of monitoring stability is meant to be the finding out of
horizontal and vertical shits of points between individual measured
stages. Surveying the inner and partly the outer base was made in the
years 2000 to 2012. The height point stability was measured in a
trigonometric way and also using the precise levelling. The positional
stability was verified by means of the radius bar method.
The instrumentation used for surveying was always the most precise
one for the certain time and had calibration protocols.
The survey was performed with classical geodetic methods, and for a
subsequent calculation and alignment of coordinates, the local
coordinate system was used, Fig. 4. The origin of the local coordinate
system is in the point 15 (y = 0 m and x = 0 m) and the positive X-axis
is inserted into the point 11 (y = 0 m, x = s11,15) (Majornik 2008). The
starting point for the trigonometric determination of heights is the
point 13 (z = 100 m).
[FIGURE 4 OMITTED]
The surveying methodology was the same in all phases. For the
spatial determination of points, directions were measured (horizontal
and vertical ones) in two groups, and lengths were measured
bidirectionally. The precise levelling was measured 2 times within the
vertical indication field.
Fig. 4 indicates the orientation of axes in the local system as
well as the situation with the deployment of surveyed points. Total
measurements were performed at all points of the inner base and two
closest points of the outer base.
4. Instrumentation and its accuracy
The instrumentation used for surveying was always the most precise
one for the certain time, and had calibration protocols.
In 2000, according to (Kostelecky 2000), the base was spatially
surveyed by Katefina Plechackova, a student of the Faculty of Civil
Engineering of the Czech Technical University in Prague. The student
used the theodolite Wild T3000 with angular accuracy of [+ or -]5 mgon
for angular measurements and for distance measurements--the
electro-optical rangeinder Wild DI2000 with the accuracy of length
determination of 1 mm +1 ppm.
In 2001 the base heights were verified by the precise leveling
(Kostelecky 2001). The participants of measurements were Ing. Vojtech
Palinkas and Ing. Jakub Kostelecky. To verify the heights, the levelling
device Zeiss Koni 007 and 3 m long levelling rod graduated by 5 mm, were
used.
In 2005 the base was spatially surveyed by Ing. Jifi Lechner, CSc.,
Ing. Ilya Umnov and Ing. Mark Kratky (Lechner 2005). The total station
Leica TCA 2003 was used for measurements with an angular accuracy of [+
or -]0.15 mgon and length precision of 1 mm +1 ppm. The base was
subsequently measured by means of the precise levelling method using the
levelling device Zeiss H05 with an invar levelling rod.
In 2007 the base heights were veriied by the method of precise
leveling (Lechner et al. 2005). The measurements were made by Ing. Jifi
Lechner, CSc., Ing. Ladislav Cervinka, Ing. Ilya Umnov and Ing. Jifi
Kratochvil. The levelling device Zeiss H05 was used for measurements. In
2007, the base was measured also by the spatial polar method using the
Total Station Leica TCA 2003. The coordinates of 2007 were consistent
with the coordinates of 2008, and therefore not listed in Table 1 and in
Table 2.
In 2008 a survey was performed by Ivan Majornik, a student of the
Faculty of Civil Engineering of the Czech Technical University in
Prague, within his bachelor>s thesis (Majornik 2008). The student
used the universal electrooptical theodolite Leica TCA2003 for
surveying. The instrument measures lengths with an accuracy of 1 mm +1
ppm and angles with an accuracy of [+ or -]0.15 mgon.
For the last time, the base was surveyed by the authors Ing. Marie
Subikova and Ing. Rostislav Dandos. The survey was performed using the
spatial polar method and heights were also veriied by the method of
precise levelling. For the spatial surveying, the Leica TS30 total
station was used, with an accuracy of measuring lengths of 1mm +1 ppm
and angular accuracy of [+ or -]0.05 mgon. To verify the heights, the
Leica DNA03 Digital Levelling Device was used with a moderate mileage
error of [+ or -]0.2 mm and a code invar rod.
5. Monitoring position stability
It is possible to perform a comparison of positional coordinates of
individual stages within the previous measurement (Villim 2011). The
comparison was always carried out in relation to the first stage (2000).
It is possible to carry out a mutual comparison of individual stage, but
due to the fact that Table 2 shows millimetre horizontal shits in
comparison with the measurements performed between 2000 and 2012, there
is no need for further comparisons.
The coordinates given in Table 1 are calculated based on the
formula (1) and then aligned within the network.
[y.sub.j] = [y.sub.15] + [s.sub.15,j] x sin [[sigma].sub.15,j],
[x.sub.j] = [x.sub.15] + [s.sub.15,j] x sin [[sigma].sub.15,j], (1)
[sigma]--bearing from point 15 to point j [gon];
[s.sub.15,j]--horizontal distance between point 15 and point j [m];
i--marking of measurement phase--year of measurements (2000, 2001, 2005
etc.); j--marking of point.
Differences of coordinates and subsequent total horizontal shift of
points are calculated on the basis of the relation (2).
[[DELTA]y.sub.2000,i] = [y.sub.i]--[y.sub.2000],
[[DELTA]y.sub.2000,i] = [x.sub.i]--[x.sub.2000], [[DELTA]p.sub.2000,i] =
[+ or -] [square root of ([y.sub.2000,i.sup.2] +
[[DELTA]x.sub.2000,i.sup.2])]. (2)
6. Monitoring height stability
In the area of the base being surveyed, the Vertical Indication
Field Pecny is located, which is a part of the levelling line of the
second order JacNespeky-Oleska. The levelling line in the area of Skalka
is led through individual points of the indication field, through the
gravity point and also through levelling marks located on the tops of
pillars. The point stability is assessed on the basis of differences in
height between the point 13, which is taken as the starting point when
determining trigonometric heights, and the other base points.
The heights are determined in a trigonometric way based on the
relationship (3). The formula (4a, 4b), i.e. the calculation of the
difference in elevation between the point 13 and j and the calculation
of vertical shits, is valid for heights determined in a trigonometric
way, Table 3, or by the method of precise levelling, Table 4.
[H.sup.i(2000).sub.j] = [H.sub.13] + [s.sub.13,j] x cot g
[z.sub.13,j] + [v.sub.p]--[v.sub.s] ; (3)
[DELTA][H.sup.i(2000).sub.13,j] = [H.sub.j]--[H.sub.13]; (4a)
[DELTA][h.sup.(2000),i.sub.13,j] = [DELTA][h.sup.i.sub.13,j] -
[DELTA][h.sup.2000.sub.13,j] (4b)
[H.sub.j]--height of point j [m]; [H.sub.13]--height of point 13
[m]; [s.sub.13,j]--distance between point 13 and determined point mj[m];
[z.sub.13,j]--zenith angle measured from point 13 to point j[m];
[v.sub.p]--instrument height [m]; [v.sub.s]--signal height [m]
Conclusions
This paper describes the way in which the stability of points of
the geodetic base Skalka is monitored. The base is part of the Geodetic
Observatory Pecny and originally served to observations of artificial
Earth satellites. At present, the base is used primarily to testing the
GPS apparatus. The testing is performed on the basis of the distance
between the determined coordinates and the reference coordinates.
The base was built in 1999-2000 and since then it has been being
regularly measured. Based on these measurements, the stability of the
base, horizontal and vertical shits in relation to the initial stage
measured in 2000, is determined. Measurements are always carried out
with the latest and most accurate geodetic instruments. Coordinates of
base points are calculated in a local system, Fig. 4, and heights are
calculated in a trigonometric way in relation to the point 13 and, from
the levelling point of view, are related to the vertical indication
field which is built on the premises.
Horizontal shifts [[DELTA]p.sub.2000,i] and vertical shifts
[[DELTA]p.sub.2000,i] vary in the order of mm. A maximum horizontal shit
is at the point No. 13-3,2 mm and a maximum vertical shift is at the
point No. 31-2,4 mm.
Vertical shits were also determined in a trigonometric way, which
is a less accurate method, but even so the differences range from -3 to
3 mm. The exception is the points 31 and 32 at which the vertical shit
is about 1 cm. This variation may be due to the inaccurate determination
of the machine height over the point monumentation of the outer base, as
it is not exactly possible to assign the end of the band to the defined
point. Given that the points 31 and 32 are monumented by the
"classical" geodesic monumentation, the vertical shift could
occur during the monitored period as well.
The points inside the base are located on hard bedrock (granite)
and it can reasonably be expected that their stability is not
compromised in any way. Monitoring the height as well as positional
stability shows a max shift [+ or -]3 mm in about 12 years, which are
negligible shifts due to the size of the entire base.
doi: 10.3846/20296991.2013.786870
References
Kostelecky, J. 2000. Zamereni testovaci zakladny pro GPS pozemnimi
metodami (shrnuti praci provedenych v roce 2000), Technicka zprava
1008/2000. Czech Republic. Zdiby: VUGTK.
Kostelecky, J. 2001. Overeni vysek testovaci zakladny pro GPS
pomoci nivelace, Technicka zprava 1015/2001. Czech Republic. Zdiby:
VUGTK.
Lechner, J. 2005. Technicka zprava o polohovem a vyskovem mereni v
siti geodetickych bodu testovaci zakladny pro GPS na geodeticke
observatori pecny i skalka--o metrologickem navazani v parametru Uhel a
delka, Technicka zprava 1086/2005. Czech Republic. Zdiby: VUGTK.
Lechner, J., et al. 2005. Delkove, vyskove a polohove urceni
geodeticke bodove site vyzkumneho Ustavu geodetickeho, topografickeho a
kartografickeho v arealu skalka, Technicka zprava. Czech Republic.
Zdiby: VUGTK.
Majornik, I. 2008. Sledovani stability GPS zakladny skalka:
Bachelor thesis [online], [cited 30 June 2012]. Available from Internet:
http://gama.fsv.cvut.cz/~cepek/proj/ bp/2008/ivan-majornik-bp-2008.pdf
Staftkova, H.; Cernota, P. 2010. Principle of forming and
developing geodetic bases in the Czech Republic, Geodesy and Cartography
36(3): 103-112. http://dx.doi.org/10.3846/gc.2010.17
Villim, A., et al. 2011. Spolocne spracovanie druzicovych a
terestrickych merani v priestorovej sieti pre dopravnuinfrastrukturu,
Civil and Enviromental Engineering, v. 7. Slovak Republic. Zilina
university.
Vitaskova, J.; Staftkova, H. 2004. Navody na mefeni s GPS. Czech
Republic. Brno: MZLU.
VUGTKa n.d. Historie observatofe Pecny [online], [cited 16 July
2012]. Available from Internet: http://oko.asu.cas.cz/pecny/ histo.html
VUGTKb n.d. Testovaci zakladna pro GPS [online], [cited 20 July
2012]. Available from Internet: http://oko.asu.cas.cz/
pecny/zgpspol.html
Milan Mikolas (1), Rostislav Dandos (2), Marie Subikova (3)
(1) Institute of Mining Engineering and Safety, Faculty of Mining
and Geology, VSB--Technical University of Ostrava, 17.listopadu 15, CZ
708 33 Ostrava, Czech Republic
(2, 3) Institute of Geodesy and Mine Surveying, Faculty of Mining
and Geology, VSB--Technical University of Ostrava, 17.listopadu 15, CZ
708 33 Ostrava, Czech Republic
E-mails: (1) milan.mikolas@vsb.cz (corresponding author); (2)
rostislav.dandos@vsb.cz; (3) marie.subikova@vsb.cz
Received 07 February 2013; accepted 26 February 2013
Milan MIKOLAS. Doc. Ing., Ph.D. VSB--TU Ostrava, Institute of
Mining Engineering and Safety, Faculty of Mining and Geology,
VSB--Technical University of Ostrava. 17.listopadu 15, CZ 708 33
Ostrava, Czech Republic. Ph+420 608 533 231, e-mail:
milan.mikolas@vsb.cz
Research interests: mining engineering and safety.
Rostislav DANDOS. Ing. VSB--TU Ostrava, Institute of Geodesy and
Mine Surveying, Faculty of Mining and Geology, VSB--Technical University
of Ostrava, 17.listopadu 15, CZ 708 33 Ostrava, Czech Republic.
Ph+420597323326, e-mail: rostislav.dandos@vsb.cz
Research interests: analysis of possible deformation monitoring of
buildings using modern technology.
Marie SUBIKOVA. Ing. VSB--TU Ostrava, Institute of Geodesy and Mine
Surveying, Faculty of Mining and Geology, VSB-Technical University of
Ostrava, 17.listopadu 15, CZ 708 33 Ostrava, Czech Republic.
Ph+420597323326, e-mail: marie.subikova@vsb.cz
Research interests: this article is part of the dissertation on the
topic of building a base for calibration apparatus GNSS.
Table 1. Coordinates of points in the local network
using a classical geodesy method
Point 2000 2005
number (j) y[m] x[m] y[m] x[m]
11 0,000 223,328 -- -
12 2,959 222,100 2,959 222,101
13 37,779 74,548 37,781 74,549
14 17,632 42,058 17,633 42,058
15 0,000 0,000 0,000 0,000
31 -24,691 265,735 -24,691 265,735
32 35,200 335,022 35,200 335,022
2008 2012
y[m] x[m] y[m] x[m]
11 0,000 223,330 0 223,330
12 2,959 222,101 2,959 222,101
13 37,781 74,549 37,781 74,549
14 17,633 42,058 17,633 42,058
15 0,000 0,000 0,000 0,000
31 -24,691 265,735 -24,691 265,735
32 35,200 335,022 35,200 335,022
Table 2. Comparison of coordinates in relation to
the default stage in 2000
Point 2000-2005
number (j) [[DELTA]y.sub [[DELTA]x.sub [[DELTA]p.sub
.2000,2005] .2000,2005] .2000,2005]
[mm] [mm] [mm]
11 -- -- -
12 -0,4 1,4 1,5
13 2,5 1,3 2,8
14 0,6 0,2 0,6
15 Fixed point of local system
31 0,0 0,0 0,0
32 0,0 0,0 0,0
Point 2000-2008
number (j) [[DELTA]y.sub [[DELTA]x.sub [[DELTA]p.sub
.2000,2007] .2000,2007] .2000,2007]
[mm] [mm] [mm]
11 0,0 1,6 1,6
12 -0,4 1,4 1,5
13 2,5 1,3 2,8
14 0,6 0,2 0,6
15 Fixed point of local system
31 0,0 0,0 0,0
32 0,0 0,0 0,0
Point 2000-2012
number (j) [[DELTA]y.sub [[DELTA]x.sub [[DELTA]p.sub
.2000,2012] .2000,2012] .2000,2012]
[mm] [mm] [mm]
11 0,0 1,8 1,8
12 -0,5 1,2 1,3
13 2,9 1,4 3,2
14 0,7 0,5 0,9
15 Fixed point of local system
31 0,2 -0,1 0,2
32 0,2 -0,5 0,5
Table 3. Differences in elevation for individual points in relation
to the point 13 determined in a trigonometric way.
Point [DELTA][H.sup.i(2000) [DELTA][h.sup.2000,i
number (j) .sub.13,j] [m] .sub.13,j] [mm]
2000 2008 2012 2000-2008 2000-2012
13 Point height taken as starting point for comparison
11 -20,583 -20,583 -20,582 0 1
12 -20,462 -20,465 -20,460 -3 2
14 -0,743 -0,740 -0,744 3 -1
15 -3,618 -3,617 -3,620 1 -2
31 -24,941 -- -24,949 -- -8
32 -27,362 -- -27,374 -- -12
Table 4. Differences in elevation of individual points in relation
to the point 13, the point heights are determined by the method
of precise levelling
[DELTA][H.sup.i(2000).sub.13,j] [m]
Point
number (j) 2001 2005 2007 2012
13 Point height taken as starting point for
comparison
11 -20,584 -20,583 -20,584 -20,584
12 -20,462 -20,460 -20,462 -20,462
14 -0,743 -0,742 -0,743 -0,741
15 -3,617 -- -- -3,617
31 -- -24,933 -- -24,936
32 -- -27,358 -27,360 -27,360
[DELTA][h.sup.2000,i.sub.13,j] [m]
Point
number (j) 2001-2005 2001-2007 2001-2012
13 Point height taken as starting point
for comparison
11 1,5 -0,1 -0,3
12 1,6 0 -0,1
14 0,8 0,3 2,2
15 -- -- 0,1
31 -- -- -2,4 *
32 -- -2 * -1,6 *
Note: The declines marked with * are determined in relation to
the stage 2005.