首页    期刊浏览 2024年11月15日 星期五
登录注册

文章基本信息

  • 标题:Accelerated Transmission Development For Accelerated Power Development
  • 本地全文:下载
  • 作者:Sher Singh Bhat
  • 期刊名称:Hydro Nepal: Journal of Water, Energy and Environment
  • 印刷版ISSN:2392-4101
  • 出版年度:2009
  • 卷号:4
  • 页码:8-10
  • 语种:English
  • 出版社:Environmental Resources Group (P) Ltd (e-RG Nepal)
  • 摘要:Due to our lack of vision, planning and other mistakes, Nepal is in a very serious situation of load shedding. The nation is about 200 MW deficit of power supply. Hydropower development is an endeavor related with several sectors. It cannot be taken as only a commercial sector considering that businessmen will make all necessary things when there is a demand. In the past, the transmission sector has not been given due importance. Because of the complex nature of Transmission, there should only be one transmission operator in the country. Based on the periodic basin-wise generation plan of the nation, we should prepare an accelerated Development Plan. The Basin Plan should indicate how and where local level, regional level and national level hydro plants will be connected to the grid, and the sequence of developing the basin transmission network. Hydro Nepal: Journal of Water, Energy and Environment Issue No. 4, January, 2009 Page 8-10
  • 关键词:Basin transmission plan;accelerated transmission development;and accelerated power development
国家哲学社会科学文献中心版权所有