Transmission Network Expansion Planning (TNEP) is an important part of power system planning in both conventional and new structured power market. Its goal is to minimize the network construction and operational cost while satisfying the demand increase, considering technical and economic conditions. Planning algorithm in this paper consisted of two stages. The former specifies highly uncertain lines and probability of congestion, considering desired generation security level (e.g. N-2 generation security level). The latter determines the optimal expansion capacity of existing lines. Splitting required capacity for reinforcement of weak lines due to desired generation security level simplifies the TNEP problem. In addition, it monitors the impact of generation uncertainty on transmission lines. Simulation results of the proposed idea are presented for IEEE-RTS-24bus network.