期刊名称:Australasian Journal of Construction Economics and Building
印刷版ISSN:1835-6354
电子版ISSN:1837-9133
出版年度:2016
卷号:16
期号:4
页码:35-53
DOI:10.5130/AJCEB.v16i4.4983
语种:English
出版社:University of Technology, Sydney
摘要:This paper establishes an optimal time incentive/disincentive-based compensation in a contract between a principal and a team of agents. The establishment is based on solving an optimization problem. In order to validate the paper's theoretical development practitioners were engaged in a designed exercise. The paper demonstrates that, at the optimum: the proportion of time incentive/disincentive compensation among agents with the same risk-attitude should reflect the levels of their contributions; the proportion of time incentive/disincentive among agents with the same level of contribution should be lowered for agents with higher levels of risk aversion; and the proportion of time incentive/disincentive to a team of risk averse agents should reduce, and the fixed component of the team fee should increase, when the agents in the team become more risk-averse or the level of the uncertainty in project completion time increases. The paper’s outcome provides guidance to those involved in contracts design for choosing the best way to reward (penalise) multiple agents, form a team, and allow for any time saving (overrun) through the terms of a contract.