首页    期刊浏览 2025年06月24日 星期二
登录注册

文章基本信息

  • 标题:Risk Management in Tunnel Construction Using MADM Techniques
  • 本地全文:下载
  • 作者:Ahmad Sayadi ; Mohammad Hayati ; Masood Monjezi
  • 期刊名称:Industrial Management
  • 印刷版ISSN:2008-5885
  • 电子版ISSN:2423-5369
  • 出版年度:2011
  • 卷号:3
  • 期号:7
  • 页码:99-116
  • 出版社:University of Tehran Electronic Journals Database
  • 摘要:Assessment of risks is a key task in the project management. In this process, Risk Breakdown Structure (RBS) approach can be utilized to identify project relevant risks. In the previous classical method, only Limited number of attributes is considered in the evaluation that can cause unreliable results. In this paper, an attempt has been made to introduce and involve a relatively comprehensive set of attributes for applying in Multi Attribute Decision Making (MADM) techniques. Using this model, the risks of tunneling construction in the Seimareh dam project, located in South-West of Iran, are assessed and ranked. For the collection of experts' judgments, group decision making method by conducting various decision panels was applied. Also for the risk ranking, Linear Assignment (LA), Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) and Simple Additive Weighted (SAW) methods were considered. Final ranking of the risks was computed using integration methods. It was concluded that the risks economical factors and guarantee are the project most and least critical risks, respectively.
  • 关键词:LA;MADM;Risk Assessment;SAW;TOPSIS;Tunneling
国家哲学社会科学文献中心版权所有