摘要:Yard storage space and yard crane equipment are the core resources in the container terminal yard area. This paper studies the integrated yard space allocation (outbound container space) and yard crane deployment problem in resource-limited container terminals where yard space and yard cranes are extremely scarce. Two corresponding counterstrategies are introduced, respectively, and the integrated problem is solved as mixed integer programming. The model this paper formulated considers the container volume fluctuation of the service line, and the objective is a trade-off between yard sharing space and terminal operation cost. In numerical experiments, this paper tries to reveal the management meaning in practical operation of container terminal and provides decision support for terminal managers; therefore a series of scenarios are presented to analyze the relations among the yard sharing space, the number of yard cranes, the size of yard subblock, and the cost of terminal operation.