期刊名称:HYDRO Nepal : Journal of Water, Energy and Environment
印刷版ISSN:1998-5452
出版年度:2014
卷号:14
页码:23-26
DOI:10.3126/hn.v14i0.11250
语种:English
出版社:Environmental Resourcs Group (P) Ltd.
摘要:As Nepal holds significant potential for a prosperous future market in hydropower and associated business developments, the Turbine Testing Lab (TTL) at Kathmandu University, Nepal has carried out a project that focuses on scientific studies to identify optimal turbine requirements for various hydropower projects. We collected and analyzed basic design data available from different sources to identify the turbine design specifications for the upcoming hydropower projects. As a result, we developed a computer program as a tool to support this work. Findings from the current studies have shown that up to 60% of the 13000 MW capacity hydropower projects under survey stage in Nepal would need Francis type of turbine with unit size below 5 MW. This finding is also supportive to establish a basis for developing turbine manufacturing and maintenance competence in Nepal from business perspectives.DOI: http://dx.doi.org/10.3126/hn.v14i0.11250HYDRO Nepal JournalJournal of Water, Energy and EnvironmentVolume: 14, 2014 JanuaryPage: 23-26
关键词:Water Energy and Environment;Hydropower; Turbine selection; Francis turbine; Turbine manufacturing; Nepal