期刊名称:Bulletin of the Institute of Heat Engineering
印刷版ISSN:2083-4187
出版年度:2015
卷号:95
期号:1
页码:90
语种:English
出版社:Warsaw University of Technology
摘要:The results of the research presented in this paper refer to an upgrade of a power generating unit with a supercriticalsteam turbine of a moderate live steam temperature. The upgrade project involves replacing the high pressure part witha turbine driven by a high live steam temperature and adding a gas turbine. The aim of the upgrade is to increasepower generation eciency. The specific problem analyzed in the paper corresponds to the matching between thegas and steam turbine especially in o-design conditions. The analysis is based on the numerical modeling of thethermodynamic cycles. Various conditions of the operation were simulated. The results obtained enable eciency to beassessed in the analyzed variants.
其他摘要:The results of the research presented in this paper refer to an upgrade of a power generating unit with a supercritical steam turbine of a moderate live steam temperature. The upgrade project involves replacing the high pressure part with a turbine driven by a high live steam temperature and adding a gas turbine. The aim of the upgrade is to increase power generation eciency. The specific problem analyzed in the paper corresponds to the matching between the gas and steam turbine especially in o-design conditions. The analysis is based on the numerical modeling of the thermodynamic cycles. Various conditions of the operation were simulated. The results obtained enable eciency to be assessed in the analyzed variants.
关键词:supercritical steam turbine; gas turbine; modernization; combined cycle