  • 标题:Review of Various Delay Causing Factors and Their Resolution by Application of Lean Principles in India
  • 本地全文:下载
  • 作者:Shumank Deep ; Mohd Asim ; Mohd Kashif Khan
  • 期刊名称:Baltic Journal of Real Estate Economics and Construction Management
  • 电子版ISSN:2255-9671
  • 出版年度:2017
  • 卷号:5
  • 期号:1
  • 页码:101-117
  • DOI:10.1515/bjreecm-2017-0008
  • 语种:English
  • 出版社:Walter de Gruyter GmbH
  • 摘要:Practically speaking, not all real estate construction projects are accomplished in the defined span and within budget. Various factors responsible for occurrence of delays are one of the long-standing issues in the field of real estate. Delays make contractors endure productivity loss, cause high disturbance expenses, and prolongation costs. The aim of the research is to summarize several delay causing factors, which are observed in the execution of previous real estate construction projects. It then proposes implementation of standard prevention procedures to minimize delays. Time effect examination is the approach to evaluating and allotting the upshots of delays or changing a venture schedule. This review sets execution framework of the two sub-principles of the Toyota Way attributes known as philosophy sub-principles and process subprinciples to guide real estate construction businesses in their lean change to delay free real estate construction work. These are implemented after investigating the critical factors responsible for delays in the delayed projects by comparing their as-planned schedules with the adjusted schedules. Methods used in the research include structured surveys and content analysis, which is performed after collection of quantitative data from the respondents. The lean construction principles will be designed and provided to clients to be productive in performing work packages on their scheduled time with minimum possibility of time overrun.
  • 关键词:Construction ; delays ; lean construction ; lean principles ; real estate